Building regulations, foundations and services

Foundations for a garden home

Here is what has to go in under a garden home, and who has to sign the ground off.

A garden home has to meet the Building Regulations in the same way a new house does. They set what its foundation has to do, and the ground in your own garden sets how big that foundation has to be.

Class 3A is the planning exemption for building a detached house in the rear garden of a main house. It came from Statutory Instrument 340 of 2026, which added Class 3A to the Planning and Development Regulations 2001 and came into operation on 27 July 2026. One of its conditions keeps two sets of rules in place: the Building Regulations, including fire safety, and the Building Control Regulations.

The Department of Housing's information note on auxiliary dwellings says the Building Regulations set minimum performance requirements for buildings, including dwellings. They are there for the safety, health and welfare of people. The note says the Building Control Regulations set out administrative and control procedures to ensure compliance with Building Regulations. An auxiliary dwelling is the note's own name for a home built in the rear garden under this exemption.

The note says those regulations apply to the design and construction of an auxiliary dwelling in the same way they apply to new houses. Each part of them has a Technical Guidance Document. Each one shows how the requirements of that part can be achieved in practice. For Part A, structure, the note points to Technical Guidance Document A, 2012. For Part C, site preparation and resistance to moisture, it points to Technical Guidance Document C.

The short version

  • What it has to do: carry the loads to the ground safely.
  • Ground movement: ground that sinks, swells, shrinks or freezes must not affect the stability of any part of the building.
  • The simple case: a strip of plain concrete under the wall, at least 200 mm thick.
  • Width: 400 mm on compact gravel, compact sand, stiff clay or firm clay, where the load on the wall is not more than 30 kN per linear metre.
  • Under the floor: at least 200 mm of hardcore, then at least 150 mm of concrete.
  • Radon: a standby sump under the floor, with a sealed membrane as well in a High Radon Area.
  • Not temporary: the construction must not be temporary in nature, such as a caravan or mobile home.
  • Before the digger: the commencement notice goes in 14 to 28 days ahead.

What the rules ask the ground to do

Two things: carrying the weight, and coping with movement in the ground.

Start with load. Part A of the Building Regulations covers structure. It asks that the combined actions liable to act on a building are sustained and transmitted to the ground safely.

Then there is movement in the ground itself. The same part names four causes of it. They are ground that sinks, swells, shrinks or freezes. Movement in the ground from any of them must not impair the stability of any part of the building.

Class 3A adds a line of its own. It says the construction of the detached house shall not be temporary in nature, such as a caravan or mobile home. If you are not sure your own plan clears that, put it to your planning authority in writing first. Read the planning rules guide for the full list of conditions.

Your own ground sets the width

Your own ground decides, and the guidance has a table for it.

Technical Guidance Document A gives guidance on strip foundations of plain concrete. Its Table 5 sorts the ground into types of subsoil, the ground under the topsoil: rock, gravel, sand, clay, sandy clay, boulder clay and silt. Two conditions come first. There should not be wide variation in type of subsoil within the loaded area. And no weaker soil should lie below the soil the foundation rests on, at a depth that could impair the stability of the structure.

The foundations should be situated centrally under the wall. The concrete has a minimum thickness. The guidance puts it at 200 mm, unless the figure its Table 5 gives is greater.

That table sets the width by the ground and the load. A load of not more than 30 kN per linear metre needs a minimum width of 400 mm on compact gravel, compact sand, stiff clay or firm clay. The width is 650 mm where that load is not more than 70 kN per linear metre. On rock not inferior to sandstone, limestone or firm chalk, it is the width of the wall plus 150 mm in each case. In no case should the width be less than the total width of the wall plus 75 mm on each side.

The table names field tests you can picture. Compact gravel and compact sand require a pick for excavation. A wooden peg 50 mm square in cross section is hard to drive beyond 150 mm in them. Firm clay can be moulded by substantial pressure with the fingers. It can be dug out with a spade.

Where there is any doubt about what is down there, the digging comes first. The guidance calls an appropriate site investigation essential where there is any doubt as to the condition of the subsoil. The design is then based on it. It says the same always applies on the loose and soft ground in its table: loose sands, soft clays and very soft clays.

Beyond that simple case, the guidance lists other standards for foundations. They include Eurocode 7, Geotechnical Design. Ask who designs the foundation for your garden, to which standard, and who signs that design.

What goes in under the floor

Three layers go in, and they go in that order.

Clear the ground first. Part C of the Building Regulations covers site preparation and damp. It requires that the ground to be covered by a building shall be reasonably free from vegetable matter. It also requires subsoil drainage where that is necessary. The point of it is to prevent the passage of ground moisture to the inside of the building, or damage to the fabric of the building.

Then the stone. Technical Guidance Document C says the hardcore bed should be at least 200 mm thick and be gas permeable. The guidance grades that stone from 4 to 40 mm, so that gas can move freely within the hardcore layer. The layer should be well compacted, clean and free from matter liable to cause damage to the concrete. It is laid in well compacted layers not exceeding 225 mm.

Then the concrete and the damp layer. The concrete should be at least 150 mm thick, but thicker if the structural design requires. The damp-proof membrane may be located above or below the concrete. It should be continuous with the damp-proof courses in walls.

Read the building regulations guide for the other parts that apply to the build.

Radon, and the capped pipe in your garden

Radon work happens under the floor, before the concrete goes on.

The Environmental Protection Agency says radon is a radioactive gas. It says radon causes about 350 cases of lung cancer in Ireland each year. Radioactivity from radon is measured in becquerels per cubic metre. Technical Guidance Document C sets a national reference level for long-term exposure to radon in dwellings. It is 200 becquerels per cubic metre. Above that level, the guidance says the need for remedial action should be considered.

Where you live sets the measures. High Radon Areas are defined as areas where it is predicted that more than 10% of dwellings will have radon gas concentrations above 200 Bq/m3. Where any part of a building falls within a High Radon Area, the entire building should be regarded as falling within that area. The guidance says buildings with high concentrations of radon gas are not confined to those areas. They can be found in any part of the country. The EPA says that even if your home is not in a High Radon Area, it may still have a high level of radon.

Check your own address before you plan the slab. The EPA says you can find your home on its radon risk map by entering your Eircode into the search bar on the map.

Start with a High Radon Area. For a non-complex building of normal design and construction, the guidance asks for a fully sealed membrane of low permeability. It should be provided over the entire footprint of the building. With it goes a potential means of extracting radon from under the floor. That means a standby radon sump or sumps under the floor, with pipes connecting them, or other appropriate certified systems. The EPA says all new homes in a High Radon Area must have a radon membrane to meet Building Regulations. It says a radon membrane is a barrier that helps stop radon coming into a building.

Outside those areas the sump still goes in. In areas other than High Radon Areas, the building should be given a potential means of extracting radon from under the floor. That is in case it proves necessary after construction. For a non-complex building of normal design and construction, a standby radon sump or sumps with connecting pipes, or other appropriate certified systems, should be adequate.

The pipework, meaning those connecting pipes, from standby radon sumps should terminate and be capped. The cap goes either above ground level externally, or in the attic space. Pipe terminals should be clearly marked to indicate the function of the pipework system. Membranes used for radon protection will normally be provided instead of the damp-proof membranes described for floors, walls and roofs.

Where you cannot dig

Two things already in the garden rule positions out.

Start with what drains the house. The EPA says that in a septic tank system the liquid flows out into a network of shallow underground pipes called a percolation area. The information note says an auxiliary dwelling should not be built on or close to an existing septic tank or percolation area. The same goes for access points to drainage infrastructure. Class 3A says that where waste water is treated on the site, the structure shall not encroach on, meaning shall not extend over, any approved percolation area.

Capacity sits in the same condition. On site waste water treatment shall be of sufficient capacity to meet the additional loading. It shall comply with the EPA Code of Practice for Domestic Waste Water Treatment Systems. And no additional waste water treatment units shall be installed as part of the class. On a bungalow in Mayo with a tank in the garden, find the drawings for that system before you pick a corner.

Then the boundaries. Class 3A says the structure shall be a distance of not less than 0.6 metres from any wall or party boundary. On a semi-d in Swords with a narrow side passage, pace that out with a tape before the position is fixed. Mark where the digger will have to stand. Read the boundary rules guide for the rest of the distances.

The footprint has both a minimum and a maximum. Class 3A says the total area of such structures in the rear garden shall not be less than 32 square metres. Taken together with any other such structures previously constructed under Class 3 in the same garden, it shall not exceed 45 square metres. The Department of Housing, Local Government and Heritage clarified on 6 November 2026 that this reference to Class 3 means Class 3A only, so the 45 square metre limit is not reduced by a shed, garage or greenhouse already in the garden.

A factory-built home still has to last

The information note says Modern Methods of Construction should be certified by NSAI Agrément. It gives prefabricated panels and modular buildings as examples of those methods. For new dwellings, including new auxiliary dwellings, it says all key elements must have a service life in the order of 60 years.

Ask any supplier for the certificate reference and the service life in writing, alongside the quote.

Nobody digs until the notices are in

Two notices go in before the work, and they are not the same one.

Start with your planning authority. Class 3A says a notification shall be submitted to the relevant planning authority not less than 14 days before the commencement of the works. Read the council notice guide for what goes into it.

Building control gets a notice of its own. The information note says a Commencement Notice with Additional Documentation is required. It must go to the local building control authority not less than 14 days and not more than 28 days before the commencement of works. The note says the planning notification is separate to the Commencement Notice process. If the works do not start within 28 days of the date the notice was lodged, a new notice must be submitted before any works take place.

There is one more step at the end. The Certificate of Compliance on Completion must be registered by the local Building Control Authority. Nobody can live in the garden home before that. The work also has to be commenced and completed within the period that ends on 31 December 2030.

Questions people ask

The Department's information note says the Building Regulations apply to the design and construction of an auxiliary dwelling in the same way they apply to new houses. Part A asks that the loads on a building are sustained and transmitted to the ground safely.

In a High Radon Area the guidance asks for a fully sealed membrane of low permeability over the entire footprint of the building. It also asks for a potential means of extracting radon from under the floor, such as a standby radon sump. In other areas a standby radon sump should be adequate for a non-complex building of normal design and construction. Check your own location by entering your Eircode into the EPA radon risk map.

No. The information note says an auxiliary dwelling should not be built on or close to an existing septic tank or percolation area. Class 3A says the structure shall not encroach on any approved percolation area.

Technical Guidance Document A calls an appropriate site investigation essential where there is any doubt as to the condition of the subsoil. It says the same always applies on loose sands, soft clays and very soft clays.

Sources, all read live on 13 November 2026. Statutory Instrument 340 of 2026 on irishstatutebook.ie. Technical Guidance Document A, Structure, and Technical Guidance Document C, Site Preparation and Resistance to Moisture, on gov.ie. The Department of Housing, Local Government and Heritage's information note on auxiliary dwellings. The Environmental Protection Agency on the radon map and on septic tanks.

General information, not planning, legal or engineering advice: check your own site with your planning authority and with whoever designs your foundation. How we check these guides.

Thinking about a garden home?

Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.

Get a FREE Quote

More on building regulations, foundations and services

Building regulations, foundations, energy performance and how water, power and wastewater connect to the main house.

Every topic