Prices

Modular home prices in Ireland

What a modular garden home costs, what the price should cover, and the fees that sit beside it.

Modular Garden Home supplies and installs modular garden homes behind existing houses across Ireland. Our 36 m² home is fully installed from €85,000 including VAT, and your exact price is fixed in writing after a free site check.

From€85,000
IncludesVAT & install
Get a FREE Quote No obligation.

Free, no deposit, no obligation. We never share your details. Privacy notice

A modular home price only tells you something once you know what it covers. Around any price sit a handful of council fees you can check for yourself, plus whatever work your own garden needs.

How to compare modular home prices

Our 36 m² garden home is fully installed from €85,000, including VAT. That covers delivery and foundations, connection to your home's water, electricity and drainage, the council's 14-day notice and the Building Regulations paperwork. Your exact price is fixed in writing after a free site check. Get a free quote.

Whoever you ask for a price, get them to put in writing what it includes and what it leaves to you. A lower figure that leaves out the foundations or the connection to your house is not really a lower price.

Line the quotes up item by item: ground work, the run of water, power and waste water across from the house, a path to the door, the fee for the professional who inspects and certifies the work, heating and hot water, and the finishes. Whoever builds it, a garden home has to meet the Building Regulations in the same way as any new home.

Ask about lifespan as well. The Department of Housing's note says every key element of a new home, a garden home included, must have a service life in the order of 60 years. A cheaper home that will not last that long is not a cheaper home.

Council fees you can look up today

  • Commencement notice: €30 per building, sent between 14 and 28 days before work starts on site.
  • Notice to the planning authority: at least 14 days before work starts. It is separate from the commencement notice.
  • Section 5 declaration: in Dublin City, €80 with a decision within four weeks, if you want the council's view in writing first.
  • Planning application: €65 for a house, if your plan falls outside the garden home rules.
  • Retention permission: €195, or €2.50 for each square metre of floor space, whichever is greater, if a home is built without the permission it needed.

Sources: Fingal County Council on commencement notices; Dublin City Council on section 5 declarations; Kilkenny County Council's planning fees; the Department of Housing's information note on garden homes. Read 14 November 2026.

The builder and the certifier every price should name

Two people have to be named before a garden home goes up. The Department of Housing's note says the council's building control section must get a commencement notice with extra documents before work starts.

Those documents must name a competent builder, who agrees to carry out the works in line with the Building Regulations. They must also name an assigned certifier, a competent professional who agrees to inspect the works and certify that they meet the Building Regulations.

When the work is finished, the builder and the assigned certifier sign a completion certificate. The council must register it before anyone can move in. So ask any seller whether both people are inside the price, and don't fix a moving date until you know when that last step will happen.

Electrics and gas have their own rules. The note says all electrical work must by law be carried out by a registered electrician. It also says anyone doing gas work in a home must by law be listed with the Registered Gas Installer scheme. Check both before work starts.

Fire safety items a full price should include

The Department's note sets out these fire precautions for a garden home. Ask for them in the quote, not on a list of extras.

  • Alarms: smoke or heat alarms in every bedroom, in the kitchen and living rooms, and in the hall or landing on the escape route.
  • Linked alarms: wired together with battery backup, or linked by radio with a 10-year battery.
  • Bedroom escape: a bedroom you can only leave through another room needs its own window or door to the outside for escape.
  • The cooker: placed away from the front door.

Ask for each one by name. A price that leaves them out is not comparing like with like.

What your garden adds to the price

Walk round your garden and look for these four things before you compare prices.

Getting it in. Everything has to reach the back garden somehow. On a mid-terrace with a narrow side passage, that changes how the ground work is done before anyone talks about the home itself. The note also expects a garden home to have its own way in from outside, separate from the main house, usually by a side path, so that passage has two jobs to do.

A septic tank. On a bungalow in Mayo with its own tank, find the tank and its percolation area first. The Environmental Protection Agency says the liquid from a septic tank flows out into a network of shallow underground pipes called a percolation area. The Department's note says a garden home should not be built on or close to either, and that the capacity of the existing drainage should be considered before it is built.

An oil tank. Where an oil tank sits within 1.8 m of the garden home, any outside wall within that distance should have 30 minutes fire resistance from the outside. There should be no window or door openings within 1.8 m of the tank either. Siting the home further from the tank avoids that extra work.

The boundary. The rules set a gap of at least 0.6 metres to any wall or boundary. The note then draws a second line at one metre. An outside wall less than 1.0 m from the boundary should resist fire from both sides for 30 minutes. One more than 1.0 m away needs that from the inside only. If your garden can spare a full metre, ask your designer how that changes the wall.

A worked example: the costs on a semi-d in Swords

Take a semi-d in Swords with a 15 m² shed at the bottom of the garden. Under the Department's clarification of 6 November 2026, a shed or other structure already in the garden does not count towards the 45 m² limit; what matters is that at least 25 m² of free garden space is left. If the shed has to come down to leave that much garden, clearing it away is a cost of its own.

Then run the fees in order. €80 for a section 5 declaration in Dublin City, if you want the council's view in writing first. The 14-day notice to the planning authority. €30 for the commencement notice. A builder and an assigned certifier, both named on it. Ground work, and services run across from the house. Ask which of these the price in front of you already covers.

The waiting times to build into your plan

Some of the waits on a garden home are set by law, and a slipped date can mean doing the paperwork twice. Plan around these.

  • Section 5 declaration, if you ask for one: the planning authority has 4 weeks from getting your request to issue it.
  • Notice to the planning authority: at least 14 days before work starts.
  • Commencement notice: lodged between 14 and 28 days before work starts. If work has not started within 28 days of lodging it, a new commencement notice must go in before any work happens.
  • Moving in: only once the council has registered the completion certificate.

So fix the delivery date before you lodge the commencement notice, not after. If the start slips past the 28 days, the paperwork starts again.

The planning route, if the garden home rules do not fit

Some plans fall outside the rules, such as a home bigger than 45 m². Outside the rules, the home needs planning permission like any other new house. Citizens Information says it costs €65 to apply for planning permission to build a house, and you may also have to pay for the newspaper notice. Your local authority must make a decision within 8 weeks of receiving the application, and for the first 5 weeks anyone can make a submission or observation on it.

Building first and asking later is the risky order. Retention permission can be refused, and the unauthorised work then has to be demolished. Even when it is granted, the fee is no saving: on a 45 m² home, €2.50 a square metre comes to €112.50, so the €195 minimum applies, three times the €65 you would have paid to apply first. For the size and boundary rules in full, read the garden home planning rules.

Get these answers in writing before you pay

  1. What the price leaves out, item by item.
  2. Who sends the 14-day notice and the commencement notice.
  3. Whether the builder and the assigned certifier are inside the price.
  4. The finished height on your ground, and the gap to each boundary.
  5. What happens to the dates if the completion certificate is held up.

For what the build itself has to meet, read the building regulations guide.

Questions people ask

€30 per building, according to Fingal County Council. The documents can be lodged online through the Building Control Management System, between 14 and 28 days before work starts on site.

No. The Department of Housing's note says the notice to the planning authority at least 14 days before work starts is separate from the commencement notice process. You need both.

Not a separate one. The garden home rules allow no separate connection to utilities, including water or wastewater, so the home runs off the main house instead.

Then the garden home rules no longer cover it. Citizens Information says the home must be built between 27 July 2026 and 31 December 2030, so leave room in the dates for delays.

Citizens Information says it is an offence to do work that needs planning permission without having it, and that the offence can carry very large fines and possible imprisonment. If you are unsure, ask before you build: in Dublin City a section 5 declaration costs €80, and the planner decides within four weeks.

Ask for them. The commencement notice for a garden home has to include general drawings of the home, so they must exist before work starts. Seeing them before you sign tells you exactly what the price is for.

Sources: Statutory Instrument 340 of 2026 on the Irish Statute Book; the Department of Housing's information note on garden homes; Citizens Information on planning permission; Fingal County Council, Dublin City Council and Kilkenny County Council; the Environmental Protection Agency on septic tanks. All read 14 November 2026.

This is general information, not planning or legal advice. Check your own site and figures with your planning authority. How we check these guides.

Thinking about a garden home?

Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.

Get a FREE Quote

More on costs and pricing

What a garden home costs in Ireland, what a quoted price includes and leaves out, and the site costs that catch people out.

Every topic