Prefab homes

Prefab homes in Ireland

Here is what to check on a factory-built garden home: its certificate, its sign-off and the order of the install.

Modular Garden Home supplies factory-built garden homes and installs them behind existing houses across Ireland. Our 36 m² home is fully installed from €85,000 including VAT. We send the council its 14-day notice and prepare the Building Regulations paperwork.

From€85,000
IncludesVAT & install
Get a FREE Quote No obligation.

Free, no deposit, no obligation. We never share your details. Privacy notice

A prefab, or prefabricated, garden home has to meet the same Building Regulations as any new home. The Department of Housing's note on garden homes says the Building Regulations apply to a garden home in the same way as they apply to new dwellings. The note also says a garden home can be built on site, with block walls or a timber frame, or with modern methods such as prefabricated panels or modular buildings.

What prefab means for a garden home

The note gives two examples of modern methods: prefabricated panels, such as walls or roof panels, and modular buildings. The Department calls these Modern Methods of Construction, and says they should be certified by NSAI Agrément.

NSAI Agrément gives independent technical assessment and certification of building products and systems for their intended use in Ireland. Its assessment can look at design, manufacture, installation, durability and performance.

Build quality: what to check

Start with how long it has to last. The note says that for new dwellings, including garden homes, all key elements must have a service life in the order of 60 years.

The materials and the work both count. Part D of the Building Regulations requires all works to be carried out with proper materials and proper workmanship. Proper materials means materials fit for the use they are meant for, and for the conditions they will be used in.

Then check the Agrément certificate yourself. The note says a list of Agrément certified systems can be found by selecting Building Systems on NSAI's search page. Ask the supplier for the certificate number and look it up there, ours included.

Who signs off a prefab garden home

Two people sign off the work. One is the builder. The other is the assigned certifier, a competent professional whose job is to inspect the work and certify that it complies with the Building Regulations.

Both are named in the documents sent with the commencement notice, which goes to your council before work starts. When the work is finished, they both sign a completion certificate and send it to the council. Nobody can move in until the council has registered it. Read the building regulations guide for each Part that applies.

Install steps, in order

  1. Check the site. Measure your garden against the rules, and ask your council in writing if you are unsure.
  2. Tell the planning authority. Send the council a notice that you intend to use the garden home rules, at least 14 days before work starts. It must give the location and the Eircode of the property.
  3. Lodge the commencement notice. It goes to the council between 14 and 28 days before work starts.
  4. Prepare the ground. Put in the foundations only after both notices are in. Read the foundations guide before anyone digs.
  5. Deliver and place the home. Plan how it reaches your back garden before delivery day.
  6. Connect the services through the main house. The rules allow no separate connection to utilities, such as water or wastewater.
  7. Register the completion certificate. Only then can anyone move in.

What it costs

Our 36 m² garden home is fully installed from €85,000, including VAT. That covers delivery and foundations, connection to your home's water, electricity and drainage, the council's 14-day notice and the Building Regulations paperwork. Your exact price is fixed in writing after a free site check. Get a free quote.

In Fingal, a commencement notice costs €30 per building. Ask whether any price you are given includes the professional who inspects and certifies the work. For the full list of fees, read the garden home cost guide.

Questions people ask

A registered electrician. The Department's note says it is a legal requirement for all electrical work to be carried out by a registered electrician.

The note says that by law, all domestic gas workers must list themselves with the Registered Gas Installer (RGI) scheme. Use an RGI for any gas work.

Linked alarms throughout the home. The note says hard-wired smoke or heat alarms with battery backup will do, or radio-linked alarms with a 10-year sealed battery.

Yes, if a wall will sit less than 1 metre from the boundary. The note says that wall should resist fire for 30 minutes from both sides, and its outer face should be made of materials rated Class B or better for reaction to fire.

Then a new commencement notice has to go in before any work takes place.

The Safety, Health and Welfare at Work (Construction) Regulations 2013 set the main rules for protecting people working on construction sites. Ask your builder how they will meet them in your garden.

Sources: the Department of Housing's information note on the Building Regulations and garden homes (July 2026); NSAI on Agrément certification; Statutory Instrument 340 of 2026 on the Irish Statute Book; Fingal County Council on commencement notices. All read 14 November 2026.

General information, not planning, legal or engineering advice: check your own site with your planning authority and your building control authority. How we check these guides.

Thinking about a garden home?

Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.

Get a FREE Quote