Modular homes in Tipperary
How to tell Tipperary County Council about a garden home, what its copy of the Department's November letter means for your shed, and the local checks on drainage and radon.
Modular Garden Home supplies and installs modular garden homes behind existing houses in every county, Tipperary included. Our 36 m² home is fully installed from €85,000 including VAT. We check every condition at a free site visit, and we send the council's 14-day notice for you.
Free, no deposit, no obligation. We never share your details. Privacy notice
In Tipperary, you tell the county council in writing at least 14 days before work on a garden home begins. Citizens Information says that since 27 July 2026 a small, detached home in your back garden no longer needs planning permission. The notice is how you tell the council you are using that exemption, and that your site meets its terms.
How the exemption works in Tipperary
The rule is known as Class 3A. It came in with Statutory Instrument 340 of 2026 on 27 July 2026. Tipperary County Council's page puts it simply: the exemption runs from that date to 31 December 2030, and it comes with 20 conditions and limitations.
The home sits behind your house and shares its services. The council gives the size as 32 to 45 square metres of floor space. Check three conditions first. The home must stand 0.6 metres or more from any wall or boundary. It cannot be used for short term letting. And at least 25 square metres of private open space has to stay free for your household. Read the planning rules guide for the full list.
Sending your notice to Tipperary County Council
Tipperary asks everyone using the exemption to fill in its own notification form. You can do it online through the council's Planning Exemptions Online Form, or return the paper form by post or by hand.
The council's page sets out what the notice must do. It states that you intend to use the exemption, confirms the site meets the requirements, and gives your reason for the garden home. It also needs the location and Eircode of the property. The paper form marks the Eircode as mandatory. It then asks for the date you send it, the date you plan to start, and a yes or no on whether your site meets all the requirements.
Tipperary's page says not less than 14 days before the works start. The council also keeps a record of every notice it gets and sends a yearly return to the Minister. For the wording and timing in more detail, read the council notice guide.
The Department's shed letter, on Tipperary's own page
Tipperary's notification form has a checklist, and one line still reads the old way. It says the total, taken together with anything already built under Class 3 (sheds, garages, stores), will not exceed 45 square metres.
The same council page now carries Circular Letter PLR 05/2026, dated 6 November 2026. It settles the point. The mention of Class 3 in that condition should be read as Class 3A only, so the new exemption is used once. Taken with the open space rule, the letter says the key test in practice is free garden space of no less than 25 square metres, regardless of any other structures in the garden.
The letter makes two more points. The exemption is not limited to detached houses. And the 45 square metres is measured as the total internal floor area of the garden home, the same way as the 45 square metres for extending a house. The shed guide has worked examples.
Asking Tipperary for a section 5
A section 5 declaration is the council's written answer on whether a particular project is exempt. Tipperary says that if you are not sure, the declaration will confirm whether or not you need planning permission.
To apply, Tipperary wants:
- its application form;
- a location map, at a scale of 1:1000 in an urban area, with the site outlined in red;
- full details and a description of the garden home;
- scale drawings and elevations;
- the €80 fee.
Under the Planning and Development Act 2000 the council issues its declaration within 4 weeks. Tipperary also publishes a list of current declarations on its website.
Building regulations still apply
Tipperary's page is clear that the exemption does not remove the need to comply with the building regulations or any other code. The Department of Housing's information note says the building control authority must be told before a garden home like this is built, by a commencement notice with additional documents.
Before that notice goes in, Tipperary says every party to it must register with the Building Control Management System (BCMS). That includes you as owner, your designer and your builder.
Septic tanks in Tipperary
The CSO counted 27,164 registered domestic waste water treatment systems in the county in 2024, or 5.5% of the national total. Together with Cork, Galway, Kerry, Donegal, Mayo and Wexford, it accounts for more than half of every registered system in Ireland, the fifth year in a row that has been so. In 2024 alone, 254 new systems were registered in Tipperary.
The CSO describes these as systems such as septic tanks, used by homes not connected to a public sewer. The EPA explains that the liquid leaving the tank runs into a network of shallow pipes under the ground, called a percolation area. So the garden home has to stay clear of any approved percolation area. Whatever treatment your house uses now must have room for the added waste water and meet the EPA Code of Practice. You may not fit an additional unit for the garden home. Before building, the Department of Housing's note asks that the capacity of your existing drainage be considered.
Radon in Tipperary
Radon is counted in becquerels per cubic metre, written Bq/m3. Up to 31 December 2019, the EPA measured 2,907 houses across Tipperary. Of those, 329 were in the 200 to 799 Bq/m3 band, and 27 were over 800. Tipperary's top result was 3,400 Bq/m3, against a national reference level of 200 for homes.
Type your Eircode into the search bar on the EPA's radon map. Inside a High Radon Area, a new home has to have a radon membrane to meet the Building Regulations. As for the house you already live in, the EPA's postal test takes three months and costs about €50.
What a Tipperary garden home costs
Our 36 m² garden home is fully installed from €85,000, including VAT. That covers delivery and foundations, connection to your home's water, electricity and drainage, the council's 14-day notice and the Building Regulations paperwork. Your exact price is fixed in writing after a free site check. Get a free quote.
On top of the garden home itself, a radon test is about €50, and a section 5 is €80 if you choose to get one. For a breakdown, read the garden home cost guide. Nearby, see our Limerick, Kilkenny and Waterford pages, or start from modular homes in Ireland.
Tipperary questions
Yes. Tipperary County Council has a Planning Exemptions Online Form, or you can return its paper form by post or by hand.
The Department's 6 November 2026 letter, on Tipperary's page, says the reference is to Class 3A only. What matters is keeping at least 25 square metres of garden free.
A location map at 1:1000 in an urban area, with the site outlined in red, plus scale drawings, elevations and the €80 fee.
No. The Department's 6 November 2026 letter says the exemption is not limited to detached houses.
Of 2,907 houses measured to the end of 2019, 329 read from 200 to 799 Bq/m3 and 27 read above 800.
Sources checked on 17 November 2026: Tipperary County Council and the Department of Housing circular it hosts, Citizens Information, the CSO and the EPA.
This is general guidance and not planning or legal advice. Tipperary County Council can tell you what applies to your site. How we work.
Thinking about a garden home?
Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.
More on choosing and buying a garden home
What to ask a supplier, what to check in a specification and how the install process runs from order to handover.
- Buying a garden home main guide
- Modular homes
- Tiny homes
- Prefab homes
- Cork
- Galway
- Limerick
- Dublin
- Donegal
- Wexford
- Kerry
- Mayo
- Meath
- Kildare
- Kilkenny
- Wicklow
- Monaghan
- Carlow
- Waterford
- Sligo
- Roscommon