Cork

Modular homes in Cork

Which council, which form, and what the ground under a Cork garden can mean for the build.

Modular Garden Home supplies and installs modular garden homes behind existing houses across Ireland, Cork included. Our 36 m² home is fully installed from €85,000 including VAT. We check every condition at a free site visit, and we send the council's 14-day notice for you.

From€85,000
IncludesVAT & install
Get a FREE Quote No obligation.

Free, no deposit, no obligation. We never share your details. Privacy notice

Cork is split between two councils, Cork City Council and Cork County Council, each with its own area. Since 27 July 2026, Citizens Information says, a small detached home can be added in your back garden without planning permission. Conditions apply.

Cork City Council or Cork County Council?

Check which council covers your address before you fill in a single form. Cork City Council says the Local Government Act 2019 is the legal basis for a bigger city, and that the city would grow to nearly five times its size.

It says the city was extended to include Ballincollig, Blarney, Glanmire and Cork Airport, but not Little Island or Carrigtwohill.

So if you live in Ballincollig, Blarney or Glanmire, start with Cork City Council. In the CSO's preliminary Census 2022 figures, Cork City had 222,333 people and Cork County had 358,898.

What the rules ask of a Cork back garden

The rules come from Statutory Instrument 340 of 2026. Measure your garden against these before you look at floor plans.

  • Its floor area must be between 32 and 45 square metres.
  • It goes to the rear of your house.
  • It cannot have its own separate connection to water or wastewater.
  • At least 25 square metres of private open space must be left for the people living in the house.
  • You must live in the main house as your only or main home when the work starts.
  • The work must be started and finished by 31 December 2030.

Cork City Council's notification form lists each requirement with a box to tick. Read it before you choose a size.

Sending the 14-day notice in Cork

Your notice has to reach the council at least 14 days before any work begins. Use the form from your own council.

Cork County Council's form goes back to planninginfo@corkcoco.ie. The form wants your contact details and Eircode, the site address, a planned start date and the reason for the home. There is also a yes-or-no question on whether the site meets every requirement in the Regulations.

Cork City Council has its own notification form on its website. It says a minimum of 14 days' notice is needed before work starts.

Before you fill in either form, read the council notice guide.

Not sure? Ask for a section 5 declaration

If you are unsure whether your plan needs planning permission, ask the council to rule on it in writing. Cork County Council says a section 5 declaration request is the way to get it to confirm in writing whether a particular development needs planning permission.

Cork County Council's fee is currently €80. Cork City Council's fee is currently €80 too. Cork County Council asks for maps and drawings bigger than A3 to be emailed as well, to planninginfo@corkcoco.ie or westcorkplanninginfo@corkcoco.ie, as appropriate.

If you disagree with a Cork City Council declaration, the council says you can ask An Coimisiún Pleanála to review it within 4 weeks of the date of the declaration, for a fee.

Building control still applies

Cork City Council says any relevant Building and Fire Regulations will continue to apply.

Before a garden home is built, the council must be told about the building work. The Department's information note says a commencement notice with additional documentation is needed, lodged between 14 and 28 days before work starts. Cork City Council says notices should be completed online on the Building Control Management System, known as BCMS.

Septic tanks and radon in Cork

Cork has more registered septic tanks and similar systems than any other county. The CSO says Cork had 57,009 registered domestic waste water treatment systems in 2024. That was 11.4% of the national total, the highest of any county. These are systems such as septic tanks, which the CSO says serve homes that are not on a public sewer.

If your house has one, think hard about where the garden home goes. The EPA says a septic tank's liquid flows out into a network of shallow underground pipes called a percolation area. The Department's information note says not to build a garden home on top of, or close to, an existing septic tank or percolation area.

Radon is a radioactive gas. The EPA says many parts of County Cork are high radon areas, with one in five homes in those areas likely to have high radon. Type your Eircode into the EPA's radon map to check your address. The EPA says all new homes in a High Radon Area must have a radon membrane to meet Building Regulations. For the floor build-up, read the foundations guide.

What a garden home costs in Cork

Our 36 m² garden home is fully installed from €85,000, including VAT. That covers delivery and foundations, connection to your home's water, electricity and drainage, the council's 14-day notice and the Building Regulations paperwork. Your exact price is fixed in writing after a free site check. Get a free quote.

A radon test for your house is about €50 and works by post, the EPA says. Get anything a quote excludes written down. Read the garden home cost guide for the other statutory fees.

Questions people ask in Cork

Cork City. Cork City Council says the city was extended to include Ballincollig, Blarney, Glanmire and Cork Airport. Little Island and Carrigtwohill were not included.

Cork County Council's notification form goes to planninginfo@corkcoco.ie. Send it at least 14 days before work starts. In the city, use Cork City Council's own form.

Up to 4 weeks. The Planning and Development Act 2000 says the planning authority shall issue the declaration within 4 weeks of getting the request. Cork County Council charges €80. So does Cork City Council.

Yes. In 2023 the EPA and Cork County Council's library service launched a scheme to lend digital radon monitors free of charge from council libraries across County Cork. The EPA says an accurate measurement needs a three-month test.

Sources: Statutory Instrument 340 of 2026 on the Irish Statute Book; Cork City Council's pages on the 2026 exemptions, section 5, commencement notices and the boundary extension; Cork County Council's notification form and section 5 page; the CSO on census population and waste water treatment systems; the EPA on radon and septic tanks; the Department of Housing's information note and circular PLR-02; Citizens Information; section 5 of the Planning and Development Act 2000. All read 15 November 2026.

General information, not planning or legal advice: check your own site with your planning authority. How we check these guides.

Thinking about a garden home?

Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.

Get a FREE Quote

More on choosing and buying a garden home

What to ask a supplier, what to check in a specification and how the install process runs from order to handover.

Every topic