Garden home council notice: the 14-day rule
Adding a detached home to your back garden means telling your planning authority before the works start. A second notice goes to the Building Control Authority before the building work begins.
You have to tell the council, at least 14 days before the works start. The Regulations call it a notification.
Citizens Information says that since 27 July 2026 you do not need planning permission to add a small, detached home in your back garden. It states the ownership rule plainly. You must own the original house and live in it as your main and only home.
In the statute that house is the principal house. The class is Class 3A, and it covers "the construction, erection or placing of a detached house in the rear garden of a principal house". S.I. No. 340 of 2026 put it into Part 1 of Schedule 2. It came into operation on the 27th day of July 2026.
So the notification is one of the conditions set for Class 3A. An exemption from planning permission means the work does not need planning permission, as long as every condition is met. Put it on the build programme beside the works themselves.
The notice, at a glance
- How long before: not less than 14 days before the works start.
- Who gets it: the relevant Planning Authority. Citizens Information tells homeowners to notify your local authority.
- What it says: that you intend to use the class, that the site meets the rules, and why.
- What it has to include: the location, and the Eircode of the property.
- The second notice: Fingal County Council says the Building Control Authority has to be told between 14 and 28 days before you start building.
- The fee for that one: Fingal says €30 per building.
What the notification has to say
It has to say three things, and carry two details.
Paragraph 16 of the conditions set for Class 3A asks for a notification to the relevant Planning Authority. It is to be sent "not less than 14 days prior to the commencement of the works". The paragraph then gives it three jobs. It informs them of the intention to use this Class of exemption. It confirms that the site meets the rules set in the Regulations. And it states the reason for the intended use.
A notification under paragraph 16 "shall include the location of the proposed use of this class of exemption and the Eircode of the relevant property".
Count the 14 days back from the day the works are to start.
What you are confirming when you say the site meets the rules
You are confirming that the site meets every requirement in the Regulations.
Citizens Information sets out these conditions, in its own words, for the detached home in your back garden:
- Be built between 27 July 2026 and 31 December 2030
- Have a floor area of between 32 and 45 square metres
- Be up to 4 metres in height, if you have a tiled or slated pitched roof, or up to 3 metres if you have a different roof
- Not be sold or subdivided separately from your main home
- Not reduce the total amount of private open space for the main house to less than 25 square metres
- Not have a separate connection from the main house for utilities, such as water
- Be at least 0.6 metres away from any wall or boundary
- Not be used for short-term letting
- Meet all building and fire regulations
The statute has its own line on building rules. It says the relevant building control legislation shall apply, such as Building Regulations (including Fire Safety) and Building Control Regulations.
The class has dates on it as well. It applies only to development that is commenced and completed during the relevant period. That period ends on 31 December 2030.
Walk the garden with a tape before you fill anything in. Read the full set of conditions you are confirming.
Where the notification goes, and what the council does with it
The notification goes to your own local authority. Ask them which form to use.
Cork County Council asks for a completed notification document, sent to planninginfo@corkcoco.ie. It asks for the applicant name and the applicant address including Eircode. It asks for a telephone number and an email address. It asks for the address of the proposed development, again including Eircode. It asks for the proposed date of commencement of works. It asks which exemption is being notified. It asks whether the site and proposed development meet all requirements set out in the Regulations. And it asks for the reasons for intended use.
Cork County Council's form states that a minimum of 14 days' notice is required to be furnished to the Planning Authority prior to commencement.
Then comes a checklist for compliance with requirements of the relevant Regulations. An auxiliary dwelling is a detached dwelling to the rear of a principal dwelling house. That is the name the Department’s information note gives it. The form has its own list to tick for Class 3A, the detached auxiliary dwelling. The ticks on Cork County Council’s checklist include these:
- The proposed development will be completed before 31st December 2030
- The dwelling will only be occupied in conjunction with the main dwelling house, and will not be sold or subdivided separate to the principal dwelling
- The works will be completed in line with the relevant Building Control legislation
- The structure is not temporary in nature, such as a caravan or mobile home
- The principal dwelling house is the sole or main residence of the property owner at the time the development is commenced
What the commencement notice is, and when it goes in
A commencement notice is the notice that goes to the Building Control Authority before construction starts. Fingal County Council says you need one if you are constructing a building. The forms go in electronically. Dún Laoghaire-Rathdown County Council says paper copies are no longer accepted. All forms must now be submitted electronically via the Building Control Management System (BCMS) website.
The notice goes to the Building Control Authority on that same website, between 14 and 28 days before you start construction on site. It has to be accompanied by the correct fee. The current fee for a commencement notice is €30 per building.
Fingal also says whose job that is. It is extremely important to submit the correct form of notice. The responsibility to do so rests with the building owner, or the person commissioning the works.
The Department of Housing, Local Government and Heritage has an information note on auxiliary dwellings. It names the form that applies: a Commencement Notice with Additional Documentation.
An auxiliary dwelling has to comply with the Building Regulations and the Building Control Regulations, whatever the planning exemption says. The note is plain about that.
Two dates in the note are worth putting in the diary. Where the works do not start within 28 days of the lodgement of the notice, a new one has to be sent first. A Certificate of Compliance on Completion is the certificate signed when the work is finished. That certificate has to be registered by the building control authority before the auxiliary dwelling can be occupied.
So plan the move-in date around that certificate, and put both notices in the diary.
If you are not sure the garden qualifies
Ask before you commit to anything, and ask in a way that gets you a written answer.
Citizens Information says you can ask your local authority if you will need planning permission. It says they can also give you general advice about your application.
Some small extensions and conservatories do not need planning permission. Citizens Information says these are known as exempted developments, meaning work that does not need planning permission, and that there are specific conditions for them.
You can also ask for the answer in writing. Section 5 of the Planning and Development Act 2000 sets out how. A declaration is the planning authority’s answer on whether the work is exempted development. A question may arise as to what, in a particular case, is or is not exempted development. Any person may then ask the relevant planning authority for a declaration on that question. The request goes in writing, with the fee. The planning authority shall issue the declaration within 4 weeks of getting the request.
Check the fee your own council charges, and the maps it asks for. Dublin City Council's section 5 application form asks for 2 copies of an OS Map, scale 1:1000. The site goes on it, clearly outlined in red. Its fee is €80.00. Read your own council's form for its figure.
Ask early. The four weeks run from the day your request reaches them.
What is at stake if the work turns out to need permission
Citizens Information is blunt about this. It is an offence to do work that requires planning permission, without having planning permission. That offence can carry very large fines and possible imprisonment.
There is one possible route back, but it has a limit. If a genuine mistake has been made, you can apply for planning permission to retain the work. That permission can be refused. The work then has to be demolished.
So treat the tick box on the form as a measuring job. If what you want is a home for a parent or an adult child, work through the conditions set for Class 3A first.
Questions people ask
Cork County Council asks for a completed notification document, sent to planninginfo@corkcoco.ie. The form is that council's own, so check what your own local authority asks for. The duty itself comes from the conditions set for Class 3A. They ask for a notification to the relevant Planning Authority, not less than 14 days prior to the commencement of the works.
Yes. A notification under paragraph 16 of the conditions set for Class 3A shall include the location of the proposed use of this class of exemption, and the Eircode of the relevant property. Cork County Council's form asks for an Eircode twice. Once in the applicant address, and once in the address of the proposed development.
Fingal County Council says the current fee for a commencement notice is €30 per building. It also says the notice goes to the Building Control Authority on the Building Control Management System website. That is between 14 and 28 days before you start construction on site, accompanied by the correct fee. Read your own council's page before you lodge it.
Sources, all read 4 November 2026. On irishstatutebook.ie: S.I. No. 340 of 2026 (Class 3A), article 6(1) of the Planning and Development Regulations 2001, and section 5 of the Planning and Development Act 2000. Citizens Information on planning permission. Cork County Council's notification form. The Department of Housing, Local Government and Heritage's information note on auxiliary dwellings. Fingal County Council on commencement notices. Dublin City Council's section 5 application form.
General information, not planning or legal advice: check your own site with your planning authority. How we check these guides.
Thinking about a garden home?
Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.
More on planning rules and the exemption
What the Class 3A exemption for detached garden homes allows, the conditions you must meet, and when you still need planning permission.
- Garden home planning rules main guide
- 45 m² garden home
- Sheds and the 45 m² limit
- Garden room vs garden home
- Boundary distances
- Mobile home in the garden
- Garage to granny flat