Buying a garden home in Ireland: survey to move-in
Know the order of the steps before you ring anyone. Two of them carry notice periods set in law.
Buying a garden home in Ireland is a sequence, not a single purchase. Class 3A was added to the planning rules by S.I. No. 340 of 2026. It asks for a notice to your planning authority at least 14 days before work starts. Your building control authority needs its own notice, not less than 14 and not more than 28 days before work starts. And a Certificate of Compliance on Completion has to be registered before anyone can move in. Work backwards from those dates and the rest of the order falls into place.
The short version
- Measure your garden first. The garden home's total area must be between 32 and 45 square metres. Under the Department's clarification, a shed already in the garden does not count toward those 45 square metres.
- Want the council's view in writing before you commit? Dublin City Council charges €80 for a section 5 declaration and decides it within four weeks.
- Two notices, two parts of the council. One to planning at least 14 days before work. One to building control 14 to 28 days before work, at €30 per building in Fingal.
- The building control notice names a competent builder and an assigned certifier, a competent professional who undertakes to inspect the works and certify that they comply with Building Regulations. Each one gives an undertaking.
- Nobody moves in until the Certificate of Compliance on Completion is registered by the building control authority.
- The exemption only covers work commenced and completed by 31 December 2030.
Sources: S.I. No. 340 of 2026; the Department of Housing, Local Government and Heritage information note on auxiliary dwellings, 1st edition July 2026; Dublin City Council; Fingal County Council. Read 19 October 2026.
What you are buying, in law
You are buying a home that stays tied to your own house. Four conditions of Class 3A say so.
- Condition 3. The garden home may only be lived in together with the main house. It cannot be sold or subdivided separate to the principal dwelling.
- Condition 19. It may not be used for short term letting.
- Condition 12. There shall be no separate connection to utilities, including water or wastewater utilities, subject to paragraph 13.
- Condition 20. The exemption only applies where the principal dwelling house is the sole or main residence of the property owner when the work starts.
Read those four before you look at a floor plan. They decide whether this suits what you have in mind at all. Next: the Class 3A planning rules.
Measure your own garden before you ring anyone
Start with a tape and a written note of the numbers. Condition 7 sets the floor area from both ends. The total area of such structures in the rear garden shall not be less than 32 square metres. Taken together with any other such structures already built under Class 3 in the same grounds, it shall not exceed 45 square metres. The Department of Housing, Local Government and Heritage clarified on 6 November 2026 that this reference to Class 3 means Class 3A only, so the 45 square metre limit is not reduced by a shed, garage or greenhouse already in the garden. So measure the free garden left around anything already standing before you settle on a size.
Then take the rest of the dimensions.
- Boundaries. The structure shall be not less than 0.6 metres from any wall or party boundary. Windows should be at least 0.6 metres from the boundary they face.
- Height. Up to 4 metres with a tiled or slated pitched roof. Up to 3 metres with any other roof.
- What is left over. The work shall not reduce the private open space kept for the use of the occupants of the house to less than 25 square metres.
- Access. No new vehicular or pedestrian access onto a road shall be built under this class. Independent pedestrian or wheelchair access to the new house shall be provided inside the grounds of your house.
- The history of the house. The exemption shall not be used where there has been a subdivision of the principal house.
Write each measurement down before you ask for a quote. A supplier can tell you what the unit is, but only your own tape tells you what the garden will take.
Find out what is already in the ground
Walk the garden and look for a tank, a manhole cover and the pipes that drain it. Condition 13 covers homes where waste water is treated on the site, with a septic tank or a similar system. The garden home must not be built over any part of an approved percolation area, the network of shallow underground pipes that carries the liquid out of a septic tank into the soil. The on site treatment shall have enough capacity to meet the extra loading. It shall comply with the EPA Code of Practice for Domestic Waste Water Treatment Systems. And no additional waste water treatment units may be installed under this class.
The Department of Housing publishes an information note on auxiliary dwellings. The note says an auxiliary dwelling should not be built on or close to an existing septic tank, percolation area or drainage access point. It also says the placement of the dwelling, and the capacity of the existing drainage, should be considered before anything is built or any new connection is made.
Fuel storage matters too. Where there is no existing oil tank within 1.8 metres of the new dwelling, no extra provisions apply. Where there is no existing LPG tank within 3 metres, no extra provisions apply either. Settle all of this before a position is marked out. Related: the building regulations guide.
If you are not sure the site qualifies, ask the council first
There is a formal route for that question. Under section 5 of the Planning and Development Act 2000, as amended, any person may ask for a declaration on whether development is exempt. Dublin City Council says the application should be in writing to the planning authority. It should come with all relevant site maps and a fee of €80. The planner then assesses it and makes a decision within four weeks. Those figures are Dublin City's. Check the same two things on your own council's page.
Two site facts can rule the exemptions out before any of this. Dublin City Council says the exemptions do not apply to a protected structure. Nor do they apply if your property is in an Architectural Conservation Area or a Special Amenity Area Order. Check your property against your council's record early.
Get the specification in writing before you pay a deposit
Ask for certificate numbers, not adjectives. Under Materials and Workmanship, the information note says modern methods of construction should be certified by NSAI Agrément. It says a list of Agrément certified MMC systems can be found on the NSAI certification search, under Building Systems. Look the number up before you pay a deposit.
One more line from the same page is worth quoting at a supplier. For new dwellings, including new auxiliary dwellings, all key elements must have a service life in the order of 60 years.
Energy is next. In accordance with S.I. No. 243/2012, the information note says a BER certificate is not required for a standalone building with a total useful floor area of less than 50 square metres. Ask a supplier in writing which fabric standard the walls, floors, roof, windows and doors are built to, and who signs it off. Related: the cost guide.
Appoint the builder and the assigned certifier
Two named people have to stand behind the work. The note says a competent construction professional and a competent builder will be required for the design and construction. It also says responsibility for compliance rests with the owners, designers and builders. You are named in that list, beside the people you hire.
The note says professional advice should be sought at the outset of the project. Before deciding to go ahead, it says, consideration should be given to all relevant legal obligations, to assess whether compliance can be achieved at all. It names the conditions in S.I. No. 340 of 2026 in particular. At the outset means before the order, not after the delivery date is booked.
The two notices, and what each one asks for
They go to two different parts of the council, and one does not cover the other. The note says the planning notification is separate to the commencement notice process.
The planning notice. Condition 16 asks for a notice to the relevant planning authority at least 14 days before work starts. It has to tell them you intend to use this class of exemption. It has to confirm that the site meets the requirements of the regulations. And it has to state the reason for the intended use. Condition 17 adds the location of the proposed use and the Eircode of the property.
Look for your own council's form for this notice. Cork County Council's form covers Class 1A and Class 3A under the Planning and Development Regulations 2001 (S.I. No. 600 of 2001), as amended, and is returned to planninginfo@corkcoco.ie. It asks for:
- Your name, address including Eircode, phone number and email address.
- The address of the proposed development, including its Eircode.
- The proposed date of commencement of works.
- Which exemption you are notifying, 1A or 3A.
- Whether the site and the proposed development meet all the requirements of the regulations.
- Your reasons for the intended use.
The form then sets out a checklist for compliance with the requirements of the regulations. Download your own council's version and work through that checklist with your measurements beside you.
The building control notice. The local building control authority must be told about the works in advance. Given the nature of the works, a Commencement Notice with Additional Documentation is required. The note lists what goes with it:
- The Commencement Notice.
- A Certificate of Compliance (Design).
- A Notice of Assignment of Person to Inspect and Certify Works. That is the assigned certifier.
- A Certificate of Compliance (Undertaking by Assigned Certifier).
- A Notice of Assignment of Builder.
- A Certificate of Compliance (Undertaking by Builder).
- General arrangement drawings, including plans, sections and elevations.
- A schedule of such plans, calculations, specifications and particulars.
- The preliminary Inspection Plan prepared by the assigned certifier.
Those documents may be lodged electronically through the Building Control Management System, and an online assessment via the BCMS must also be completed. Fingal County Council puts the fee at €30 per building. Fingal also says the Building Control Authority must be notified on the BCMS portal between 14 and 28 days before you start on site.
The timing is strict at both ends. The notice and its documents must be in not less than 14 days and not more than 28 days before work starts. Once it is validated, work must start between day 14 and day 28 of the submission. If work does not start within 28 days of the date of lodgement, you must submit a new notice before anything takes place. Ask your builder, in writing, who lodges the notice and on what date. Ask what happens to your delivery slot if that window is missed.
Install day and the trades the law names
Two of the trades are named in law, not left to choice. The note says it is a legal requirement that all electrical work is carried out by a registered Electrician. It says the Commission for Regulation of Utilities regulates domestic gas installers through the Registered Gas Installer scheme. All domestic gas workers must list themselves with that scheme by law.
The note also points at the Safety, Health and Welfare at Work (Construction) Regulations 2013, S.I. No. 291 of 2013. Those regulations set the main requirements for protecting the safety, health and welfare of people working on construction sites. The note points homeowners to the Health and Safety Authority guide on getting construction work done safely. Read that guide before contractors arrive in your garden.
Sign-off: the certificate that sets the move-in date
Moving in waits on a register entry, not on a handover. On completion, a Certificate of Compliance on Completion has to be signed by the builder and the assigned certifier. It goes to the local building control authority, through the BCMS or in hard copy. The note says the CCC must be registered by that authority before the auxiliary dwelling can be occupied.
If you are doing this for your parents, or for a son or daughter, that registration is the date to plan a move around. Ask who lodges the CCC. Ask what their experience is of how long registration takes with your own council.
A worked example: a bungalow in Mayo on its own treatment system
This house is not on a public sewer, so condition 13 comes first rather than last. Before a position is chosen, the percolation area has to be found. The on site waste water treatment shall be of sufficient capacity to meet the additional loading and shall comply with the EPA Code of Practice for Domestic Waste Water Treatment Systems. No additional treatment units may be added. And the new building must not be built over the percolation area. That one condition can decide where in the garden the home goes. Where it goes then decides the distance to each boundary.
With the position settled, the order runs like this.
- The specification and the drawings.
- A builder and an assigned certifier named.
- The commencement notice and the BCMS assessment, 14 to 28 days before work.
- The planning notice, at least 14 days before work, with the Eircode on it.
- The work itself.
- The CCC signed and registered before anyone moves in.
If the ground work slips and the 28 days run out, a new commencement notice goes in before anything restarts.
After move-in, the exemption is still asking things of you
The conditions do not stop applying on the day the keys arrive. The dwelling may only be occupied in conjunction with the main dwelling house. It cannot be sold or subdivided separate to the principal dwelling. It may not be used for short term letting. If it is let at all, another set of rules applies. The note says every dwelling that is let or available for let, including an auxiliary dwelling, comes under the Housing (Standards for Rented Houses) Regulations 2019. Local authorities may inspect it.
The whole project also sits inside a window. The relevant period starts on the date the regulation was signed and ends on 31 December 2030. The exemption only applies to work commenced and completed inside that period. Related: the granny flat guide.
What to ask before you pay a deposit
Six questions, and the answers belong on paper.
- What is the finished height on my ground, and how far is each wall from each boundary on the drawing?
- If the unit is built off site, what is its NSAI Agrément certificate number?
- What are the U-values of the walls, floors, roof, windows and doors, and who signs off on them?
- Who is the assigned certifier, who is the builder, and is each fee inside the price?
- Who lodges the commencement notice and the BCMS assessment, and on what date?
- Who signs and lodges the Certificate of Compliance on Completion?
The rest of our guides take the conditions one at a time.
Questions people ask
Measure the garden against the Class 3A conditions first. Check what drainage and fuel storage is already in the ground. Get the specification and certification in writing. Appoint a competent builder and an assigned certifier. Lodge the commencement notice with building control 14 to 28 days before work starts. Notify the planning authority at least 14 days before work starts, with the Eircode. Build. Then have the Certificate of Compliance on Completion registered before anyone moves in.
Yes, twice and separately. Condition 16 of Class 3A asks for a notice to the relevant planning authority at least 14 days before work starts. It has to state that you intend to use the exemption, confirm the site meets the requirements, and give the reason. Condition 17 adds the location and the Eircode. Building control separately needs a Commencement Notice with Additional Documentation, not less than 14 and not more than 28 days before work starts.
Ask for a section 5 declaration. Under section 5 of the Planning and Development Act 2000, as amended, any person may ask for a declaration on whether development is exempt. Dublin City Council says the application should be in writing with all relevant site maps and a fee of €80, with a decision within four weeks. Check the same two things on your own council's page.
Cork County Council's form covers Class 1A and Class 3A. It asks for your name, address including Eircode, phone number and email address. It asks for the address of the proposed development, including its Eircode. It asks for the proposed date of commencement of works. It asks which exemption you are notifying. It asks whether the site and proposed development meet all the requirements of the regulations, and your reasons for the intended use. It then sets out a checklist of those requirements. It is returned to planninginfo@corkcoco.ie.
No. A Certificate of Compliance on Completion must be signed by the builder and the assigned certifier. It must then be registered by the local building control authority before the auxiliary dwelling can be occupied.
Ask for the NSAI Agrément certificate number. The Department's information note says modern methods of construction should be certified by NSAI Agrément. It says a list of Agrément certified systems can be found by selecting Building Systems at the NSAI certification search link. It also says that for new dwellings, including new auxiliary dwellings, all key elements must have a service life in the order of 60 years.
Yes. The relevant period starts on the date the regulation was signed and ends on 31 December 2030. The exemption only applies to development that is commenced and completed during that period.
Condition 19 says the detached dwelling may not be used for short term letting. Condition 3 says it may only be occupied in conjunction with the main dwelling house, and cannot be sold or subdivided separate to the principal dwelling. Any dwelling that is let or available for let, including an auxiliary dwelling, comes under the Housing (Standards for Rented Houses) Regulations 2019 and may be inspected by local authorities.
Sources: S.I. No. 340 of 2026. The Department of Housing information note on auxiliary dwellings, 1st edition July 2026. Cork County Council's Class 1A and Class 3A notification form. Dublin City Council on section 5 declarations. Fingal County Council on commencement notices. All read 19 October 2026. General information, not planning, legal or engineering advice: check your own site, drawings and dates with your planning authority, your building control authority and your own professionals. How we check these guides.
Thinking about a garden home?
Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.
More on choosing and buying a garden home
What to ask a supplier, what to check in a specification and how the install process runs from order to handover.
- Modular homes
- Tiny homes
- Prefab homes
- Cork
- Galway
- Limerick
- Dublin
- Donegal
- Wexford
- Kerry
- Mayo
- Meath
- Kildare
- Kilkenny
- Wicklow
- Monaghan
- Carlow
- Waterford
- Tipperary
- Sligo
- Roscommon