Kerry

Modular homes in Kerry

The council's form, its pre-planning service, and a radon test you should not skip.

Modular Garden Home supplies and installs modular garden homes behind existing houses across Ireland, Kerry included. Our 36 m² home is fully installed from €85,000 including VAT. We check every condition at a free site visit, and we send the council's 14-day notice for you.

From€85,000
IncludesVAT & install
Get a FREE Quote No obligation.

Free, no deposit, no obligation. We never share your details. Privacy notice

To put a garden home behind your house in Kerry, you send Kerry County Council a notice on its own form before work begins. Since 27 July 2026, Citizens Information says, a small detached home in your back garden no longer needs planning permission. The conditions still apply, and the council must hear from you at least 14 days before work starts.

How Kerry County Council sums up the rule

The garden home rule is called Class 3A. Statutory Instrument 340 of 2026 added it to the planning regulations. Kerry County Council describes it as a detached home at the rear of your house, sharing the house's services, of 32 to 45 square metres.

Kerry's page also says that any structures already in your garden that did not need planning permission count towards that 45 square metre maximum. The Department of Housing, Local Government and Heritage clarified on 6 November 2026 that the reference to Class 3 in condition 7 of Class 3A should be a reference only to Class 3A. In practice, it says, the key requirement is that free garden space can be no less than 25 square metres, regardless of any other structures in the garden. So measure the free garden your shed, garage or garden room would leave you before choosing a size.

Kerry also strongly advises homeowners, and anyone acting for them, to read every legal requirement themselves. Start with the planning rules guide.

Sending your notice to Rathass

Kerry's planning web page has a notification form for Class 1A or 3A. You complete it and send it to the Planning Department. The department is at Rathass, Tralee, Co. Kerry, V92 H7VT, and its email is plan@kerrycoco.ie.

The notice tells the council you plan to build under the garden home rule, confirms the site meets the requirements and gives your reason. It must also give the location and the Eircode of the property. Read the council notice guide before you post it.

Pre-planning advice from a Kerry planner

You can ask a planner about your site first. Kerry's 2026 pre-planning form asks for an Ordnance Survey map of the site's location. It also asks for photos that show the site in context, such as the land and buildings next to it.

Post it to the Planning Department at Áras an Chontae, Rathass, or email it to plan@kerrycoco.ie. A planner reads the form and decides how to answer: by phone, by written report or at an appointment.

Holiday letting is ruled out

Kerry County Council has its own short-term letting forms, such as Form 16 for letting that goes beyond 90 days. A garden home built under Class 3A, though, cannot be used for short-term letting at all.

Asking Kerry for a formal answer

If you are unsure whether your plans need planning permission, you can ask the council in writing. This is a section 5 declaration. Kerry's page says you pay the set fee and give the council whatever information it needs to decide. The Planning and Development Act 2000 gives the council 4 weeks to issue its answer.

Septic tanks: one of Ireland's biggest counts

Kerry had 34,672 registered domestic waste water treatment systems in 2024, the CSO says, which was 7% of the national total. These are septic tanks and similar systems at homes with no public sewer. Kerry is among the seven counties that together held more than half of all registered systems.

If your house is one of them, the rules are strict. The garden home cannot go over the area where the tank's waste water drains into the ground. Your current system must have room for the extra load and meet the EPA Code of Practice, and no extra treatment unit is allowed. The Department of Housing adds that the capacity of your existing drainage should be looked at before anything is built.

Radon: Kerry's results stand out

Radon is a radioactive gas. Its level is given in becquerels per cubic metre (Bq/m3), the unit for radioactivity. The EPA recommends action in any home at 200 Bq/m3 or above.

The EPA's county results run to the end of 2019. It measured 4,562 Kerry houses: 618 were between 200 and 799 Bq/m3, and 152 were above 800. The single highest reading in Kerry was 49,000 Bq/m3, the highest maximum for any county in the EPA's table.

Put your Eircode into the EPA's radon map. In a High Radon Area, every new home must have a radon membrane under the Building Regulations. Testing your own house costs about €50 by post, and the EPA says an accurate result takes a three-month test.

Building control in Kerry

Planning is one process and building control is another, the Department of Housing says. Before work starts, a commencement notice with additional documents must reach the building control authority between 14 and 28 days ahead.

In Kerry, that goes through BCMS, the Building Control Management System. Each person named on the notice, the owner, designer and builder among them, must register on BCMS first. Kerry's building control office is at Tralee Fire Station, Balloonagh, Tralee, V92X858.

What a Kerry garden home costs

Our 36 m² garden home is fully installed from €85,000, including VAT. That covers delivery and foundations, connection to your home's water, electricity and drainage, the council's 14-day notice and the Building Regulations paperwork. Your exact price is fixed in writing after a free site check. Get a free quote.

Add about €50 for a radon test. Then read the garden home cost guide and the page on modular homes in Ireland.

Kerry questions

To Kerry County Council's Planning Department at Rathass, Tralee, Co. Kerry, V92 H7VT, or by email to plan@kerrycoco.ie.

Not in practice. Kerry County Council's page says existing structures that did not need planning permission are included in the 45 square metre maximum. The Department's clarification of 6 November 2026 says the condition's reference to Class 3 should be a reference only to Class 3A, and that the key requirement is at least 25 square metres of free garden space.

No. A garden home built under Class 3A cannot be used for short-term letting.

A planner reads your form and replies by phone, by written report or at an appointment set up in advance.

Test and see. Of 4,562 Kerry houses the EPA measured, 152 were above 800 Bq/m3.

This page draws on Citizens Information, Kerry County Council, the Department of Housing, the CSO and the EPA, all checked on 15 November 2026.

General information only, not planning or legal advice. Check your own site with Kerry County Council. How we work.

Thinking about a garden home?

Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.

Get a FREE Quote

More on choosing and buying a garden home

What to ask a supplier, what to check in a specification and how the install process runs from order to handover.