Kildare

Modular homes in Kildare

Two notices, one reference number, and the order that keeps your paperwork valid.

Modular Garden Home supplies and installs modular garden homes behind existing houses nationwide, Kildare included. Our 36 m² home is fully installed from €85,000 including VAT. We check every condition at a free site visit, and we send the council's 14-day notice for you.

From€85,000
IncludesVAT & install
Get a FREE Quote No obligation.

Free, no deposit, no obligation. We never share your details. Privacy notice

In Kildare, the garden home notice asks for a reference number from building control, so plan that paperwork early. Since 27 July 2026, Citizens Information says, a small, detached home in the back garden has not needed planning permission. There are conditions, and one is that you notify your local authority at least 14 days before work begins.

The rule, as Kildare County Council sets it out

Class 3A is the name of the rule, and Statutory Instrument 340 of 2026 created it. Kildare's planning page quotes the Department's circular, effective from 27 July 2026. It describes a detached home to the rear of your house, linked to its services, of between 32sqm and 45sqm.

You also need to keep at least 25 square metres of private open space for the people living in the main house. Go through the planning rules guide for the rest of the conditions.

Kildare's notice wants your BCMS number

Email the completed notification, with a site layout plan, to plancerts@kildarecoco.ie. A commencement notice tells the local building control authority about the building work before construction starts. The form asks for the BCMS submission number of your commencement notice. Kildare says a notification may be deemed invalid if that number is missing.

BCMS is the Building Control Management System. It generates a unique reference number automatically when a commencement notice has been submitted. So lodge the commencement notice first. Then send the planning notice, so it reaches the council at least 14 days before work starts.

The form also asks for the width, depth and height of the home, and its total floor area. It wants the total area of any garden structures and extensions already on the site, too. Measure those before you start. Then read the council notice guide.

What Kildare building control asks for

The Department of Housing's information note sets the timing. The commencement notice and its additional documents go to the building control authority 14 to 28 days before the start date.

Part L is the part of the Building Regulations about saving energy and limiting heat loss. Kildare's current policy is to ask for construction details with every commencement notice. It also wants a draft Part L specification report and the ventilation strategy for the new home. The construction details must match the materials named in that report. Every party to the project, the owner, designer and builder included, registers on BCMS first.

Section 5: Kildare returns incomplete forms

Unsure whether your plan needs planning permission? A section 5 declaration lets you put that question to the council in writing, for a fee. Kildare is strict about the paperwork: incomplete forms are deemed invalid and returned. A valid application needs:

  • the fee of 80 euro;
  • a site location map, at 1:2500 in rural areas or 1:1000 in urban areas;
  • a site layout plan at 1:500;
  • drawings of the development at 1:50, which show the original house, every extension and the new work separately.

By law, the council must issue its declaration within 4 weeks. A Section 57 Declaration tells the owner of a protected structure which works would or would not affect the building's character. Kildare charges no fee for it.

Ground checks: septic tanks and radon

In 2024, 15,333 domestic waste water treatment systems were registered in Kildare, the CSO says, and 231 of those were new. Septic tanks are one type, used where a home has no public sewer. A percolation area, in the EPA's words, is a network of shallow pipes under the ground. The tank's liquid flows out into it. The garden home has to stay clear of the approved one. Your septic tank system needs enough spare capacity for the extra load and must comply with the EPA's code of practice. A second waste water treatment unit is not allowed. Before building, the Department of Housing wants you to consider what your existing drainage can handle.

Radon is a radioactive gas, and the EPA measures its radioactivity in becquerels per cubic metre (Bq/m3). For a home, 200 Bq/m3 is the level at which the EPA recommends doing something about it. By the close of 2019 the EPA had tested 1,600 Kildare houses. It found 66 in the 200 to 799 band and 3 over 800, and the top result was 1,100 Bq/m3.

Type your Eircode into the EPA radon map to see where you stand. New homes in High Radon Areas need a radon membrane, a fully sealed layer over the whole footprint of the building, under the Building Regulations. A postal kit for the house you live in costs about €50, and the test runs for three months.

What a Kildare garden home costs

Our 36 m² garden home is fully installed from €85,000, including VAT. That covers delivery and foundations, connection to your home's water, electricity and drainage, the council's 14-day notice and the Building Regulations paperwork. Your exact price is fixed in writing after a free site check. Get a free quote.

Budget roughly €50 for a radon test. A section 5 declaration, if you need one, costs 80 euro. For the full breakdown, see the garden home cost guide, or go back to modular homes in Ireland.

Kildare questions

It wants the BCMS submission number of your commencement notice, and Kildare says the notification may be deemed invalid without it.

Email the completed notification and a site layout plan to plancerts@kildarecoco.ie.

Construction details with every commencement notice, a draft Part L specification report and the ventilation strategy for the home.

The fee is 80 euro, and Kildare returns incomplete forms as invalid.

No. Kildare County Council charges no fee for it, and it is for protected structures only.

We read each source on 15 November 2026. They are Kildare County Council, Wicklow County Council, Citizens Information, the Department of Housing, the CSO and the EPA.

This is general guidance rather than planning or legal advice, so confirm the details for your own site with Kildare County Council. How we work.

Thinking about a garden home?

Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.

Get a FREE Quote

More on choosing and buying a garden home

What to ask a supplier, what to check in a specification and how the install process runs from order to handover.

Every topic