Where Roscommon County Council wants your garden home notice, how long a section 5 takes there, and who carries the building regulations once the planning side is done.
Modular Garden Home supplies and installs modular garden homes behind existing houses in every county, Roscommon included. Our 36 m² home is fully installed from €85,000 including VAT. We check every condition at a free site visit, and we send the council's 14-day notice for you.
Free, no deposit, no obligation. We never share your details. Privacy notice
Roscommon County Council's planning department has to get your garden home notice no later than 14 days before building starts. Since 27 July 2026, Citizens Information says, a small, detached home in your back garden does not need planning permission. The exemption comes with conditions, and your notice tells the council you meet them.
The rule in brief
Its name is Class 3A. Statutory Instrument 340 of 2026 put it into the planning regulations, in force from 27 July 2026. It lasts until 31 December 2030, and your project must begin and end within that time.
Roscommon's planning page puts it plainly: if the conditions cannot be complied with, the work cannot count as exempt. Keep three in mind from day one. You cannot sell the garden home or split it off from your house. It needs a gap of 0.6 metres or more to any wall or boundary. And your own household must keep 25 square metres or more of private open space. Read the planning rules guide for the full list.
Posting your notice to Áras an Chontae
Roscommon has its own Class 3A notification form. Post it to the Planning Department, Roscommon County Council, Áras an Chontae, Roscommon, Co. Roscommon, F42 VR98. For questions, ring 090-6637100 or email planning@roscommoncoco.ie.
On the form you give the site address with its townland, plus the Eircode and your planned start date. You answer yes or no to whether the site meets all the requirements, and you explain why you want the garden home. The form says a minimum of 14 days' notice is required. There is room for an agent, if someone is sending it on your behalf. For more on timing, read the council notice guide.
One box to tick confirms the garden home is not temporary in nature, such as a caravan or mobile home.
The shed line on the Roscommon form
The Roscommon checklist adds structures already put up under Class 3, like a garage or a shed, into the 45 square metre limit.
The Department of Housing has explained that wording. Its clarification of 6 November 2026, which Wicklow County Council has put online, reads Class 3 in that condition as meaning Class 3A only: you use the new exemption one time. What really counts, according to the Department, is that free garden space stays at 25 square metres or more, whatever else is built in the garden. Work through the examples in the shed guide.
A section 5 in Roscommon, and how long it takes
Not sure your plan is exempt? You can ask the council directly. Roscommon calls this a Section 5 Declaration.
Send the application form, a location map, drawings of the garden home, full details and a description, and the €80 fee. Roscommon says it issues the declaration within 4 weeks of getting the request. If it asks you for more information, the declaration issues within three weeks of receiving it.
Who answers for the building regulations
Roscommon's notification form is direct about this: the Class 3A exempt status does not exempt the building from the Building Regulations or the Building Control Regulations. Owners, builders and registered construction professionals have to show, through building control processes, that the work was designed and built to the Building Regulations.
The council's building control page goes further. Legal responsibility for meeting the Building Regulations lies with the designers, builders and owners of the work, and the council's role includes inspecting for compliance. On top of the planning notice, the Department of Housing's guidance calls for a commencement notice with additional documentation. It goes to the building control authority not less than 14 days and not more than 28 days before the works start.
Septic tanks in Roscommon
The CSO's count for Roscommon was 15,932 domestic waste water treatment systems on the register in 2024. That year Roscommon recorded 296 new registrations, 5% of all new ones in the country, enough to rank it in the top seven counties. Systems like these, septic tanks among them, serve homes with no public sewer connection.
From a septic tank, the EPA explains, the liquid drains out through shallow pipes under the ground, known as a percolation area. Keep the garden home off any approved percolation area. The system you have now has to handle the added load and still comply with the EPA Code of Practice. A second treatment unit for the garden home is not allowed. Before you build, the Department of Housing's note asks you to weigh up what your drainage can carry.
Radon in Roscommon
In the EPA's results by county, up to 31 December 2019, 825 houses in Roscommon had been measured. Of those, 89 came in between 200 and 799 Bq/m3 and 4 came in over 800. Bq/m3, becquerels per cubic metre, is how radon is measured. The top reading in the county was 1,400 Bq/m3, and the reference level for homes nationally is 200.
The EPA's radon map takes your Eircode. Where it shows a High Radon Area, every new home needs a radon membrane under the Building Regulations. For the house you live in now, a postal test runs for three months at about €50.
What a Roscommon garden home costs
Our 36 m² garden home is fully installed from €85,000, including VAT. That covers delivery and foundations, connection to your home's water, electricity and drainage, the council's 14-day notice and the Building Regulations paperwork. Your exact price is fixed in writing after a free site check. Get a free quote.
Besides the garden home itself, allow roughly €50 if you test for radon and €80 if you apply for a section 5. For a breakdown, open the garden home cost guide. See also our Galway and Mayo pages. Or go back to modular homes across Ireland.
Roscommon questions
Planning Department, Roscommon County Council, Áras an Chontae, Roscommon, F42 VR98. Allow a minimum of 14 days before work starts.
Within 4 weeks of the request, or within three weeks of any further information the council asks for. The fee is €80.
Yes. Roscommon's form says the Class 3A status does not exempt it from the Building Regulations or the Building Control Regulations.
Yes. It asks for the site address including the townland, and the Eircode.
The EPA measured 825 houses up to the end of 2019. Of those, 89 were between 200 and 799 Bq/m3, and 4 were over 800.
Sources, all read on 17 November 2026: Roscommon County Council, Citizens Information, the CSO, the EPA and the Department of Housing, whose 6 November clarification appears on Wicklow County Council's website.
General guidance only, not planning or legal advice. Roscommon County Council can confirm what applies to your site. How we work.
Thinking about a garden home?
Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.
More on choosing and buying a garden home
What to ask a supplier, what to check in a specification and how the install process runs from order to handover.
- Buying a garden home main guide
- Modular homes
- Tiny homes
- Prefab homes
- Cork
- Galway
- Limerick
- Dublin
- Donegal
- Wexford
- Kerry
- Mayo
- Meath
- Kildare
- Kilkenny
- Wicklow
- Monaghan
- Carlow
- Waterford
- Tipperary
- Sligo