Modular homes in Monaghan

The Dublin Street notice, the old permission worth digging out, and what to check under a Monaghan garden.

Modular Garden Home supplies and installs modular garden homes behind existing houses in every county, Monaghan included. Our 36 m² home is fully installed from €85,000 including VAT. We check every condition at a free site visit, and we send the council's 14-day notice for you.

From€85,000
IncludesVAT & install
Get a FREE Quote No obligation.

Free, no deposit, no obligation. We never share your details. Privacy notice

To put a garden home behind a Monaghan house, you email a notice form to the council's planning office at least 14 days before work begins. Since 27 July 2026, Citizens Information says, adding a small, detached home to your back garden needs no planning permission. Each condition still has to be met, and Monaghan County Council asks you to confirm them one by one.

What Monaghan County Council says the rule allows

The rule's name is Class 3A. It was added to the planning regulations by Statutory Instrument 340 of 2026, in force from 27 July 2026. Monaghan's planning page sums it up as a detached home at the back of your house, linked to your house's services, of 32 to 45 square metres.

There is a deadline too: Monaghan says building must begin and end within a window that closes on 31 December 2030. The full list of conditions is in our planning rules guide.

Dig out your house's planning permission first

This is the Monaghan point most people miss. The council warns that a condition attached to a planning permission can take an exemption away. It advises reading every permission for your site before you start even small works.

So find the grant of permission for your house, and any later ones for extensions. Read the conditions at the end. If one of them limits building in the garden, or you cannot tell, get a written answer from the council before you order anything. The section 5 steps further down tell you how.

The notice form, line by line

Monaghan publishes its own notification form. When it is filled in, email it to planning@monaghancoco.ie. You will be asked for:

  • your own address with its Eircode;
  • the address and Eircode of the site;
  • when you plan to start;
  • your reasons for the garden home;
  • a tick for yes or no: does the site, and what you plan, meet all the requirements in the Regulations?

Then comes a checklist. A few lines are about the people, not the building. Your house must be the owner's only or main home when work starts. The garden home can only be lived in together with the main house, and it cannot be sold or split off from it. There is also a box to tick saying the home is not temporary, like a caravan or mobile home. Our council notice guide covers how to word the reasons.

Sheds and the 45 square metres

Monaghan's checklist copies the regulation's text, which counts the 45 square metres together with anything already built under Class 3. That is the class for garden structures such as a shed, store, garage or greenhouse.

That reading has since been cleared up. On 6 November 2026 the Department of Housing, Local Government and Heritage issued a clarification, now on Wicklow County Council's website, saying the Class 3 in that line means Class 3A only. What counts in practice, according to the Department, is that free garden space stays at 25 square metres or more, whatever other buildings are there. Your shed does not eat into the garden home's floor area. It does eat into the garden, though, and the rule protects a minimum of 25 square metres of private open space for your household. Our shed guide has worked examples.

Asking Monaghan for a section 5 declaration

A section 5 declaration is the council's formal written answer on whether your plan needs planning permission. In Monaghan the fee is €80. Make the request in writing, ideally on the council's form, by email to planning@monaghancoco.ie or by post to Planning, Monaghan County Council, 1 Dublin Street, Monaghan H18 X982.

Give a detailed description of what you plan and as much information as the council needs to assess it. It may come back and ask for more. If you are unhappy with the answer, you can appeal it within 4 weeks of the date of the declaration, and there is a fee for that too. For a quick question first, the planning office number is 047 30532.

Building control: the commencement notice

Building control is a separate track from planning. Before construction, the Department's information note says, the building control authority has to be told about the work, using a commencement notice that comes with extra documents.

Monaghan's timing: the authority needs the notice between 28 and 14 days ahead of the start. Apply online, on the system called the BCMS. You, as owner, nominate your builder on it, and each party must be registered on the BCMS to fill in or sign their part.

Septic tanks in Monaghan

Read this part if your house is not on a public sewer. By the CSO's count, Monaghan had 11,746 registered septic tanks and similar systems in 2024, and 91 were registered that year. These serve homes that are not on a public sewer.

From the tank, says the EPA, the liquid seeps out through shallow underground pipes known as a percolation area. That brings three limits. The garden home must stay off the approved percolation area entirely. Your tank system has to cope with the added load and meet the EPA Code of Practice. And a second treatment unit is not allowed. The Department of Housing also says to think about your drainage capacity before any building starts.

Radon in Monaghan

Radon is worth a look even where the county figures are mild. The gas is radioactive, and the EPA reports it in becquerels per cubic metre (Bq/m3). By 31 December 2019 it had measured 372 Monaghan houses: 352 came in under 200, 20 fell in the 200 to 799 band, and none were over 800. The highest reading was 800 Bq/m3.

The EPA recommends taking steps to lower radon wherever a home reads 200 Bq/m3 or higher. Your Eircode tells you, on the EPA radon map, whether you are in a High Radon Area. If you are, the Building Regulations call for a radon barrier in the new home: a sealed membrane across its entire footprint. For your existing house, a test costs about €50, all by post, and needs three months to be accurate.

What a Monaghan garden home costs

Our 36 m² garden home is fully installed from €85,000, including VAT. That covers delivery and foundations, connection to your home's water, electricity and drainage, the council's 14-day notice and the Building Regulations paperwork. Your exact price is fixed in writing after a free site check. Get a free quote.

Budget a little extra: roughly €50 to test your house for radon, and €80 for a section 5 declaration if your old permission raises a doubt. The garden home cost guide breaks the rest down, or go back to our Ireland-wide page.

Monaghan questions

Email the council's notification form to planning@monaghancoco.ie. Citizens Information says the council must have it at least 14 days ahead of the work.

It can. Monaghan County Council says a condition on a planning permission can remove an exemption, so read every permission for your site first.

Write to the council, ideally on its form, with the €80 fee and a detailed description, by email to planning@monaghancoco.ie or by post to 1 Dublin Street, Monaghan H18 X982.

No more than 28 days and no less than 14 days before work starts, online through the BCMS.

Yes. None of the 372 Monaghan houses the EPA measured were over 800 Bq/m3, but 20 were between 200 and 799. Look up your own Eircode on the EPA's map.

Sources: Monaghan County Council, the Department of Housing (including its clarification as published by Wicklow County Council), Citizens Information, the CSO and the EPA, each checked by us on 16 November 2026.

Use this as a guide, not as planning or legal advice, and confirm your own site with Monaghan County Council. How we work.

Thinking about a garden home?

Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.