Granny flat or extension: which one should you build?

Both can go ahead without planning permission since 27 July 2026, and both stop at 45 square metres. The paperwork is where the two routes part company.

Since 27 July 2026 you no longer need planning permission to extend your home by up to 45 square metres. You no longer need it to add a small, detached home in your back garden either. Each route has its own conditions and you have to meet all of them. The detached home has to be between 32 and 45 square metres, and you must tell your local authority at least 14 days before the work starts.

Both routes are open to you. The question is which one your garden, your house and your family can carry. So take each one in turn.

Which one needs planning permission?

Neither, if you stay inside the rules. Citizens Information lists both among the jobs that no longer need permission since 27 July 2026. One is adding a small, detached home in your back garden. The other is extending your home by up to 45 square metres. It also says you must follow specific rules to get these exemptions.

The size is the easy part. The conditions decide it, and they differ by route. If you are not sure where your own plan lands, you can ask the council in writing. A section 5 declaration is a formal, written request made to a local planning authority under the Planning and Development Act 2000. It asks whether a project counts as exempted development, which means work you can do without planning permission. It confirms whether a project requires full planning permission or is exempt. Waterford City and County Council says it costs 80 euro, with a four week decision time.

What the extension route asks of you

An extension goes on the back of the house, and it cannot go above the house. Citizens Information puts it plainly. You can build an extension or conservatory to the rear of your house as long as it does not increase the original floor area of the house by more than 45 square metres, and is not higher than the house.

Then comes the catch that trips up a lot of families. The floor area for these rules includes the extension you are proposing now. It also includes the floor area of any previous extensions, including those you previously got planning permission for. So a kitchen extension put on years ago comes off the 45 square metres before you start.

  • An extension above ground level must be at least 2 metres away from any boundary.
  • Above ground level it stops at 12 square metres for a terraced or semi-detached house, and 20 square metres for a detached house.
  • It must not reduce the open space at the back of the house to less than 25 square metres. That open space means the space there that is used only by the people who live in the house.
  • A window at ground level has to be at least 1 metre from the boundary it faces.
  • The roof of the extension cannot be used as a balcony or terrace.

Before 27 July 2026 the extension limit was 40 square metres. It went up to 45 on that date. A house already extended close to the old ceiling may have a little room now that it did not have last year.

What the garden home route asks of you

A detached home in the garden is a separate building, so the rules treat it as one. It has a floor as well as a ceiling. Statutory Instrument 340 of 2026 sets the total area of such structures in the rear garden at not less than 32 square metres. Taken together with other such structures, it must not go over 45 square metres.

The rest of the conditions are about who lives in it, and how it sits in your garden. The detached dwelling may only be occupied in conjunction with the main dwelling house. It cannot be sold or subdivided separate to the main house. You must also own the original house and live in it as your main and only home.

  • At least 25 square metres of private open space has to be left for the people living in the house.
  • At least 0.6 metres from any wall or boundary.
  • Up to 4 metres high with a tiled or slated pitched roof, or up to 3 metres with a different roof.
  • No separate connection from the main house for utilities, such as water.
  • A way in on foot, or by wheelchair, within the grounds of your own house.
  • Started and finished between 27 July 2026 and 31 December 2030.
  • No short term letting.
  • Tell your local authority at least 14 days before the work starts.

Two of those shape the long run. The garden home cannot be sold on its own, so it never becomes a second site you could release later. And the window closes on 31 December 2030. Read the full planning rules guide for every condition in order.

Does one route use up the other's allowance?

Not in the way most people fear. Three links are worth knowing before you plan around them.

The 45 square metres for an extension counts your earlier extensions. The garden home's own total is measured on its own. The Department of Housing, Local Government and Heritage has clarified the point in practice. The key requirement is that free garden space can be no less than 25 sqm, regardless of any other structures that may be erected or built in the garden.

Next, you cannot extend the garden home later under the extension rules. Statutory Instrument 338 of 2026 says that exemption may only be used on your own house. It may not be used on any additional detached house in the grounds of it. Whatever you build out the back is the size it stays.

And if you were weighing up dividing the house instead, that door shuts too. Citizens Information says you cannot get that exemption from planning permission if you also have a detached house in your back garden.

The paperwork each route puts in front of the council

Here is the real split between the two, and a quote rarely spells it out.

For the garden home you send your local authority a notification at least 14 days before the work starts. The Department's information note is clear that this is separate to the commencement notice process. The note calls the building an auxiliary dwelling. An auxiliary dwelling is a detached home to the rear of your house, built under the exemption in Statutory Instrument 340 of 2026.

A commencement notice is the notice you send your council's building control office before building work starts. Fingal County Council says you need one if you are constructing a building, making a material alteration to a building, extending a building or materially changing the use of a building. It goes in on the BCMS portal. BCMS is the Building Control Management System, and the documents may be lodged electronically through it. Send it between 14 and 28 days before you start construction on site, with the correct fee. Fingal gives that fee as 30 euro per building.

What has to go with that notice is where the routes diverge. For a garden home, a commencement notice with additional documentation is required. The Department's note lists what goes in with it:

  • A certificate of compliance for the design, general arrangement drawings, a schedule of plans and specifications, and a preliminary inspection plan.
  • The nomination and undertaking of a competent builder, to carry out the works in accordance with building regulations.
  • The nomination and undertaking of a competent professional to inspect and certify the works in compliance with Building Regulations.

Statutory Instrument 359 of 2026 says which works these building control rules cover. They apply to works in connection with the design and construction of a new dwelling, or an extension to a dwelling involving a total floor area greater than 45 square metres.

Then there is the end of the job. Your builder signs a certificate of compliance on completion, and it goes to the building control authority. For a garden home that certificate must be registered by the authority before anyone can move in. Put that date in your plan, not at the end of it.

The costs you can actually put a figure on

Nobody can quote your build price off a web page. These are the statutory figures, read live today.

  • Commencement notice: 30 euro per building, per Fingal County Council.
  • A section 5 declaration, if you want the council's view in writing: 80 euro, with a four week decision time, per Waterford City and County Council.
  • If your plan does need permission, Citizens Information gives the fee to build a house as 65 euro. The fee for a house extension, or for converting a garage for use as part of a house, is 34 euro.
  • A decision generally comes within 8 weeks of the local authority getting the application. It costs 20 euro for anyone to make a submission on it.

The expensive mistake is not a fee. It is an offence to do work that requires planning permission without having planning permission. That offence can carry very large fines and possible imprisonment. You can apply to retain an unauthorised development. That permission can be refused, and then the unauthorised development will have to be demolished. The 80 euro buys that risk out.

Where the build money actually goes

A garden home is a new home, and it is priced like one. The Department's note says the Building Regulations apply to the design and construction of an auxiliary dwelling in the same manner as they apply to new dwellings. It also says a competent construction professional and competent builder will be required.

So you pay for a full set of a home's parts, not an extension of the ones you have:

  • Its own bathroom with a bath or shower and a basin, its own kitchen sink, and hot and cold water to all of them.
  • A cold water storage cistern holding not less than 212 litres.
  • A fire detection and alarm system to the Irish standard, with alarms in the bedrooms, the escape route and the high fire risk rooms.
  • A way in with a clear width of at least 0.9 metres, and a toilet inside.
  • All key elements built to a service life in the order of 60 years.

Position costs money too. If any external wall ends up less than 1.0 metres from the boundary, that wall should be fire resisting from both sides, achieving 30 minutes fire resistance. Moving the building half a metre can be cheaper than building up to that standard. And if it is made in a factory, the note says Modern Methods of Construction may be used for these homes. That covers prefabricated panels and modular buildings, and they should be certified by NSAI Agrement. Ask for that certification by name.

Ask each supplier to price the same list. Walls and roof, the services, the connections to the house, the finishes, and the paperwork at each end of the job. Get both in writing before you choose either route. Read the garden home cost guide for what sits inside a garden home quote.

Walk your garden before you ring anybody

Take a tape measure out the back and write down four numbers. They decide this more than any brochure will.

  1. The open space you would have left. Keep at least 25 square metres of garden used only by the people living in the house, whichever route you choose.
  2. The floor area of every extension already on the house. Take it off 45 square metres to see what the extension route has left.
  3. The gap from where a garden home would sit to the nearest boundary. Under 1.0 metres and the wall specification goes up. Under 0.6 metres and it is out.
  4. The way in. You need a route to the garden home on foot, or by wheelchair, inside your own grounds, with a clear width of at least 0.9 metres.

Then put the plan, with those numbers on it, to your planning authority in writing. Do that before you pay a deposit on either route. Read the boundary distances guide and the building regulations guide next.

Questions families ask

Nobody can answer that off a web page, so get both priced in writing on the same scope. What the rules do fix is the standard a garden home has to reach. The Building Regulations apply to its design and construction in the same manner as they apply to new dwellings. So it needs its own bathroom, kitchen sink, hot and cold water, alarms, and a way in with a clear width of at least 0.9 metres.

Since 27 July 2026 you do not need planning permission to add a small, detached home in your back garden, as long as you follow the specific rules for it. Those include a floor area of between 32 and 45 square metres, and being built between 27 July 2026 and 31 December 2030. You must also tell your local authority at least 14 days before the work starts.

You can extend your home by up to 45 square metres without planning permission. That total includes the extension you are proposing now and the floor area of any previous extensions, including those you previously got planning permission for. Before 27 July 2026 the limit was 40 square metres.

Not under the extension exemption. Statutory Instrument 338 of 2026 says that exemption may only be used on your own house, and not on any additional detached house in the grounds of it.

Fingal County Council says you need a commencement notice if you are constructing a building, making a material alteration to a building, extending a building or materially changing the use of a building. The fee it gives is 30 euro per building, submitted on the BCMS portal between 14 and 28 days before construction starts.

No. The detached dwelling may only be occupied in conjunction with the main dwelling house, and cannot be sold or subdivided separate to the main house.

Sources, all read on the day this guide was published. Statutory Instruments 338, 340 and 359 of 2026 on irishstatutebook.ie. Citizens Information on planning permission and on altering your house. The Department of Housing, Local Government and Heritage's information note on auxiliary dwellings. Fingal County Council on commencement notices. Waterford City and County Council and Wicklow County Council on exempted development.

General information, not planning or legal advice: check your own site with your planning authority. How we check these guides.

Thinking about a garden home?

Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.