Building regulations and services

Water, power and drainage for a garden home

A garden home runs off the house you already own. The pipes and cables in your garden decide more than the home itself does.

A garden home cannot have its own water or wastewater connection. The rules allow it no separate connection to utilities, such as water or wastewater. The Department of Housing's circular letter describes the home as linked to the services of the principal house. Inside, it gets the fittings of a new home. That means a bath or shower, a basin and a kitchen sink, with hot and cold water to all three.

Citizens Information says the same thing in plainer words. A detached home in your back garden must not have a separate connection from the main house for utilities, such as water.

Those rules come from Statutory Instrument 340 of 2026. It added a new class to the planning regulations and came into operation on 27 July 2026. It covers placing a detached house in the rear garden of a main house. The Department of Housing's circular letter puts its size between 32 square metres and 45 square metres.

The short version

  • No separate connection: not to water, not to wastewater.
  • Inside: a bath or shower, a basin, a kitchen sink, hot and cold water, and a 212 litre cold water tank.
  • The drain: at least 100 mm across, laid to a fall, and reachable when it blocks.
  • Rain: roof water has its own route, and should not go into a wastewater treatment system.
  • A septic tank: no new treatment unit, and enough capacity for the extra load.
  • The trades: electrical work by a registered electrician, gas work by a registered gas installer.

Can a garden home have its own water or electricity connection?

No. The rules say there shall be no separate connection to utilities, including water or wastewater utilities. Citizens Information puts it as not having a separate connection from the main house for utilities, such as water.

So plan on one supply doing two homes. Check what yours can take before you order anything.

What has to be plumbed in

It is treated as a new home, so it gets the fittings of one. The Department's information note says that as it is a new dwelling, it should be provided with the appropriate hygiene facilities.

The note sets out what those are. A bathroom containing either a fixed bath or a shower bath and a basin. A kitchen containing a sink of adequate size and a draining board. And a suitable installation for the provision of hot and cold water to the bath or shower, basin and sink.

There is one number to carry to your builder. The note says a cold water storage tank should be provided. It calls that tank a cistern. Its actual capacity should be not less than 212 litres.

Where the waste water goes

Into the drain you already have. Check that before anything is ordered. The Department's note says the drainage of waste water from the hygiene facilities must conform to Part H of the Building Regulations. So must the drainage of surface water from the roof. Part H is the one headed drainage and wastewater disposal.

Part H sets two duties. A building shall be provided with such a drainage system as may be necessary for the hygienic and adequate disposal of foul wastewater from the building. It shall also have such a system as may be necessary for the adequate disposal of surface water.

Technical Guidance Document H is the 2016 guidance that goes with Part H. It defines domestic wastewater as water discharged from kitchens, laundry rooms, lavatories, bathrooms, toilets and similar facilities.

The two kinds of water are kept apart. Part H says no part of a drainage system carrying foul wastewater shall be connected to a sewer reserved for surface water. And no part carrying surface water shall be connected to a sewer reserved for foul wastewater.

The Department's note is specific about the drains you already have. The capacity of the existing drainage should be considered before the home is built. It should also be considered before any new connection is made, so that it can handle the extra flow.

Walk the garden and find your manhole covers first. For what sits under the home itself, read the foundations guide.

The size and fall of the drain

Here are the numbers your builder works to. Technical Guidance Document H says a drain carrying foul wastewater should have a diameter of at least 100 mm.

It also has to run downhill. The guidance says drains should be laid to falls and have enough capacity to carry the flow. The flow depends on the appliances connected, and the capacity depends on the size and gradient of the pipes.

Its table of recommended minimum gradients gives a fall of 1 in 60 for a 100 mm pipe. That is for one dwelling, at a peak flow of less than 2.5 litres per second.

Check whether the drain is yours alone. The guidance says to consult the local authority where a drain serves two or more dwellings or properties.

It also says that where an extension is built over or close to a drain, the work should not endanger the integrity of the drain. Nor should it limit access to the drain for inspection or maintenance.

The same guidance adds three things worth knowing before you agree a route. The system should be accessible for clearing blockages. It should be adequately protected from accidental damage from sources such as traffic, ground settlement and tree roots. And it should prevent foul air from the drainage system entering the building and be ventilated to stop gases building up.

That last one is a plumbing detail with a number on it. Every point of discharge should have a water seal, called a trap. Under working and test conditions, traps should retain a minimum seal of 25 mm.

For sizing, the guidance takes the minimum daily discharge of foul drainage as 150 litres per head per day for domestic use.

Rain off the roof

Roof water is a separate job. Technical Guidance Document H says roof water should be carried to a sewer, a soakaway or a watercourse.

Surface water is rain that has not gone into the ground. The guidance defines it as water from precipitation which has not seeped into the ground. It is discharged to the drain or sewer system directly from the ground or from the exterior building surfaces.

Gutters and pipes are sized off one figure. The flow depends on the area being drained and the rainfall intensity. That intensity should be assumed to be 75 mm per hour for roof drainage design.

One line applies if your house is not on a public sewer. The guidance says rainwater or surface water should not be discharged to a wastewater treatment system.

A soakaway comes with distances of its own. The guidance says soakaways should not be built within 5 m of a building or road, or in areas of unstable land. They should not be built within 5 m of any drainage fields, drainage mounds or other soakaways. They should be sited down gradient. They should not be built in ground where the water table reaches the bottom of the soakaway at any time of the year.

If your house is on a septic tank

Start by knowing where the pipes run. The Environmental Protection Agency says the solids settle out and form a sludge, which needs to be emptied from time to time to prevent blockage. The liquid flows on through the tank and out into a network of shallow underground pipes, called a percolation area. Find those pipes on the ground before you measure anything.

The Department's note says one of these homes should not be built on or close to an existing septic tank or percolation area or access points to drainage infrastructure.

Then three more conditions apply. Where waste water is treated on the site, the garden home must not be built over any part of an approved percolation area. The treatment on site shall be of sufficient capacity to meet the additional loading. It shall also comply with the Environmental Protection Agency Code of Practice for Domestic Waste Water Treatment Systems. And there shall be no additional waste water treatment units installed under this class.

So a second tank is not an option. The one you have needs the capacity for the extra load.

Somebody has to go out and test the ground. The Agency says the homeowner must engage a suitably qualified person who will visit the site and test the ground. That person checks that:

  • the site is not too steep;
  • there is enough space;
  • the soil is deep enough;
  • the waste water will drain away correctly.

And the answer is not yours to give. The Agency says not all sites are suitable, and that the ultimate decision rests with the local or planning authority.

The Code of Practice is written for single houses, or equivalent developments with a population equivalent of less than or equal to 10. It takes the design load from the maximum population that can inhabit the premises, based on the number of bedrooms. To work out capacity it uses a typical daily hydraulic loading of 150 litres per person.

The Code sets distances you can pace out yourself. Its table of minimum separation distances covers a dwelling house on the site. It gives 7 m from the tank or plant, and 10 m from the infiltration or treatment area.

On a bungalow in Mayo, pace out the tank, the percolation area and what is left of the garden, then get the ground tested.

Power, heating and a tank in the garden

Two trades are named in law, so ask to see their registration. The Department's note says it is a legal requirement that all electrical work is carried out by a registered electrician.

Gas work is covered by law too. The note says the Commission for Regulation of Utilities regulates all domestic gas installers through the Registered Gas Installer scheme. By law, all domestic gas workers must list themselves with that scheme.

Find your oil tank before you settle on where the home goes. The note says that where there is no existing oil tank within 1.8 m of the new home, no additional provisions apply. Closer than that, any external wall or eaves less than 1.8 m from the tank should have 30 minutes fire resistance from the outside. The home should also have no window or door openings within 1.8 m of an oil storage tank.

For heating and insulation, read the energy standard guide.

What to put in writing before you order anything

Get the services priced as their own line, not buried in a figure for the home. Ask each supplier to price the same list:

  • the trench from the house, and who digs it;
  • the water supply in;
  • the foul drain out, with its size and fall;
  • where the roof water goes;
  • the electrical work, and who signs it off.

Then ask two questions about what you already have. Where does your foul drain run, and is there room to get at it? And if you are on a tank, what does the person who tests your ground say?

None of it skips the building rules. The regulations say that for the avoidance of doubt, the relevant building control legislation shall apply. That means the Building Regulations, including fire safety, and the Building Control Regulations. The Department's note says that irrespective of the exemption from planning permission, one of these homes must comply with Building Regulations and Building Control Regulations. Read the building regulations guide for the full list of parts.

The council gets told before the work starts. A notification goes to the planning authority not less than 14 days before the works begin. It tells them you mean to use this class of exemption. It confirms the site meets the requirements and states the reason for using it. It has to give the location and the Eircode of the property. Read the council notice guide before you write yours.

If you are not sure your own garden clears all of this, ask and get it in writing. Waterford City and County Council describes a section 5 declaration as a formal, written request. It is made to a local planning authority under the Planning and Development Act 2000. The council says the declaration confirms whether a project requires full planning permission or is exempt. It costs €80, with a four-week decision time.

Questions people ask

No. The rules say there shall be no separate connection to utilities, including water or wastewater utilities. Citizens Information puts it as not having a separate connection from the main house for utilities, such as water. The Department of Housing's circular letter describes the home as linked to the services of the principal house.

Technical Guidance Document H says a drain carrying foul wastewater should have a diameter of at least 100 mm. Its table of recommended minimum gradients gives a fall of 1 in 60 for a 100 mm pipe. That is for one dwelling, at a peak flow of less than 2.5 litres per second.

No. The rules say there shall be no additional waste water treatment units installed under this class. Where waste water is treated on the site, the garden home must not be built over any part of an approved percolation area. The treatment on site shall be of sufficient capacity to meet the additional loading.

Technical Guidance Document H says roof water should be carried to a sewer, a soakaway or a watercourse. The guidance says rainwater or surface water should not be discharged to a wastewater treatment system.

The Department of Housing's information note says it is a legal requirement that all electrical work is carried out by a registered electrician. For gas, it says the Commission for Regulation of Utilities regulates all domestic gas installers through the Registered Gas Installer scheme.

Sources, all read 20 November 2026. Statutory Instrument 340 of 2026 on irishstatutebook.ie. Citizens Information on planning permission. The Department of Housing, Local Government and Heritage's information note on auxiliary dwellings and its circular letter PLR-02. Technical Guidance Document H, Drainage and Waste Water Disposal, 2016. The Environmental Protection Agency on septic tanks, and its Code of Practice for Domestic Waste Water Treatment Systems. Waterford City and County Council on exempted developments.

General information, not planning or legal advice: check your own site with your planning authority. How we check these guides.

Thinking about a garden home?

Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.

Get a FREE Quote

More on building regulations, foundations and services

Building regulations, foundations, energy performance and how water, power and wastewater connect to the main house.

Every topic