Can you live in a log cabin in your back garden in Ireland?
Two different sets of planning rules cover buildings in a back garden, and the one that applies depends on whether anybody lives in the building.
Since 27 July 2026 you do not need planning permission to add a small, detached home in your back garden. It has to have a floor area of between 32 and 45 square metres, and be built between 27 July 2026 and 31 December 2030. A shed, store, greenhouse or similar structure in the garden must not be lived in.
So start with the use, not the brochure. Will anybody sleep in it? That answer picks the rules. Both sets are below. Read the one that fits, then walk your own garden with a tape.
The two sets of rules, and the sizes they allow
Statutory Instrument 340 of 2026 inserted Class 3A into the planning regulations and came into operation on 27 July 2026. Class 3A covers placing a detached house in the rear garden of a main house. Citizens Information puts the size plainly: a floor area of between 32 and 45 square metres.
Statutory Instrument 338 of 2026 replaced Class 3, which covers a greenhouse, garage, store, shed or other similar structure within the grounds of a house. The Department's circular letter says that allowance went from 25 square metres to 30 square metres. A structure under Class 3 must not be lived in. If the cabin is going to be an office, a gym or a store, read the garden room and garden home guide instead.
What the rules ask of a cabin you are going to live in
A home in the rear garden may only be lived in together with your house, and that garden home cannot be sold separately from the house. You have to own that house and live in it as your main and only home. These are the conditions to walk your garden against:
- A floor area of between 32 and 45 square metres.
- At least 25 square metres of private open space left for the people living in the house.
- At least 0.6 metres away from any wall or boundary.
- No more than 4 metres high with a tiled or slated pitched roof, or 3 metres in any other case.
- No separate connection to utilities, including water or wastewater utilities.
- A way in on foot or by wheelchair within the grounds of your house.
- Started and finished in the period that ends on 31 December 2030.
- No short term letting.
Measure the free space in your rear garden first. Do that before you measure anything else. The Department's clarification on that condition says the key requirement in practice is free garden space of no less than 25 sqm, regardless of other structures in the garden. Read the full planning rules guide for every condition in order.
The condition a cabin can fall on
The garden home must not be temporary in nature, such as a caravan or mobile home. So the first thing to ask about any cabin is how it is founded and fixed to the ground. That one line is why a cabin needs a straight answer from your council. A brochure is not an answer. Put your cabin, your foundation detail and your site to the council in writing before you pay anything. Read the mobile home in a back garden guide for how that condition reads.
What the Department's guidance says about timber
An auxiliary dwelling is the Department's name for a detached home to the rear of your house, built under the exemption from planning permission in Statutory Instrument 340 of 2026. Its information note says such a home can be built on site, using standardised construction methods, such as blockwork, or timber frame. Factory made panels, such as wall or roof panels, or modular buildings may be used as well.
What the note does set is the standard the building has to reach. Irrespective of the method used, an auxiliary dwelling must comply with Irish Building Regulations. For new dwellings, including new auxiliary dwellings, all key elements must have a service life in the order of 60 years. The materials Part requires that all works be carried out with proper materials and in a workmanlike manner. The note describes proper materials as materials which are fit for the use for which they are intended, and for the conditions in which they are to be used.
Those are the two lines to put to anybody selling you a cabin. Ask for the 60 year figure in writing. Do it before you pay a deposit.
The building standard a home in the garden has to reach
The Building Regulations apply to the design and construction of an auxiliary dwelling in the same manner as they apply to new dwellings. The note lists the parts of the Building Regulations it has to meet:
- Structure.
- Fire safety.
- Site preparation and resistance to moisture.
- Materials and workmanship.
- Ventilation.
- Hygiene.
- Drainage and wastewater disposal.
- Heat producing appliances.
- Stairways, ladders, ramps and guards.
- Conservation of fuel and energy.
- Access and use.
Read the building regulations guide for what each of those asks on site. Where the cabin sits changes the walls. If any external wall is less than 1.0 m from the boundary, that wall should be fire resisting from both sides, achieving 30 minutes fire resistance. So measure to each boundary before you order anything.
Two pieces of paper go with the work. Both go to the council. In advance of construction the local Building Control Authority must be notified of the works, and a Commencement Notice with Additional Documentation is required. That notice goes in not less than 14 days and not more than 28 days before works start. When the work is finished, make sure the completion certificate reaches that authority. It is called the Certificate of Compliance on Completion. Nobody can live in the garden home until the authority has registered it.
If the cabin is only going to be a garden room
Then Class 3 is the set to read, and the structure must not be lived in. It also rules out keeping pigs, poultry, pigeons, ponies or horses in it, and any purpose other than one incidental to the enjoyment of the house. Since 27 July 2026 a garden structure of up to 30 square metres, like a shed or home office, no longer needs planning permission.
The other Class 3 limits are a height of 4 metres with a tiled or slated pitched roof, or 3 metres in any other case. Nothing may go forward of the front wall of the house. Private open space to the rear or side must not drop below 25 square metres. The Department's circular letter describes that allowance as the one for a structure in the back garden, such as a shed, store, home office or gym.
How to be sure before you pay a deposit
Ask the council, in writing, about your own garden. It is the only way to be sure. Section 5 of the Planning and Development Act 2000 lets any person request in writing from the relevant planning authority a declaration on the question. Wicklow County Council says a Section 5 referral needs the application form, a fee of EUR 80, a location map, drawings, and full details and a description of it. It says the planning authority shall issue the declaration within four weeks of receiving the request.
A notice to the planning authority comes next. Citizens Information says you must notify your local authority about adding a home to your garden at least 14 days before the work starts. The notice states the intention to use this class, confirms the site meets the requirements, gives the reason for the intended use, and includes the location and Eircode. That is separate to the Commencement Notice process, so both have to be sent.
Citizens Information says it is an offence to do work that requires planning permission without having planning permission. The offence can carry very large fines and possible imprisonment. You can apply for permission to retain the work, that can be refused, and then the unauthorised development will have to be demolished. The Department's note says to consider all relevant legal obligations first, to assess the feasibility of achieving compliance, especially against the conditions in the 2026 regulations.
Questions people ask
Since 27 July 2026 you do not need planning permission to add a small, detached home in your back garden. It has to have a floor area of between 32 and 45 square metres. A shed, store or greenhouse in the garden must not be lived in. Put your own cabin and site to your planning authority before you buy.
It depends on which set of rules you are under. A home in the rear garden has a floor area of between 32 and 45 square metres. Since 27 July 2026 a shed or home office in the garden runs to 30 square metres, and must not be lived in.
The Department's information note says an auxiliary dwelling can be built on site using standardised construction methods, such as blockwork, or timber frame. Irrespective of the method used, it must comply with Irish Building Regulations. All key elements must have a service life in the order of 60 years.
The Department's information note says a BER certificate is not required for a standalone building with a total useful floor area of less than 50 square metres. Conservation of fuel and energy is still one of the parts of the Building Regulations the home has to meet.
No. There shall be no separate connection to utilities, including water or wastewater utilities for an auxiliary dwelling.
At least 0.6 metres away from any wall or boundary. If any external wall ends up less than 1.0 m from the boundary, that wall should be fire resisting from both sides, achieving 30 minutes fire resistance.
Sources, all read on the day this guide was published. Statutory Instruments 340 and 338 of 2026 on irishstatutebook.ie. Section 5 of the Planning and Development Act 2000. Citizens Information on planning permission. The Department of Housing, Local Government and Heritage's information note on auxiliary dwellings and its circular letter PLR-02. Wicklow County Council on Section 5 referrals and on the Department's clarification.
General information, not planning or legal advice: check your own site with your planning authority. How we check these guides.
Thinking about a garden home?
Get a free, no-obligation quote for a garden home in your back garden. Whether a garden home suits your site depends on the Class 3A conditions, so check them for your own property.
More on uses and layouts
Garden homes as granny flats, a first home for a grown-up son or daughter, or space for yourself: layouts that work in 32 to 45 m².
- Granny flats and garden home uses main guide
- For an adult child
- Who can live in it
- What you can use it for
- For elderly parents
- Benefits and trade-offs